Finding Aid of the Bunker Hill Redevelopment Project records
Table of Contents
Finding aid prepared by Katie Richardson and Janeal Speight, August 2010
The processing of this collection and the creation of this finding aid was funded by the generous support of the Council on Library and Information Resources.
Summary Information
- Repository
- USC Libraries Special Collections
- Creator
- Bunker Hill Redevelopment Project.
- Title
- Bunker Hill Redevelopment Project records
- Collection no.
- 0226
- Date [inclusive]
- 1938-1997
- Extent
- 46.0 Linear feet, 26 boxes plus oversize material
- Language
- English
- Abstract
- The collection spans from 1938 to 1997 and consists of items related to the redevelopment of Bunker Hill: legal documents, reports, studies, brochures, proposals, serials, books, photographs, design proposals, and Community Redevelopment Agency studies.
Preferred Citation
[Box/folder# or item name], Bunker Hill Redevelopment Project records, Collection no. 0226, Regional History Collections, Special Collections, USC Libraries, University of Southern California
Historical Note
The Bunker Hill Redevelopment Project began in 1955 when the city of Los Angeles decided to modernize the downtown area by building skyscrapers and giving it a more sophisticated look. Spearheaded by the Community Redevelopment Agency of the City of Los Angeles, California, and its principal downtown planner, Yukio Kawaratani, Bunker Hill was transformed and eventually became synonymous with downtown L.A. Its long-standing history can be separated into seven distinct periods:
I. "The Rise of Bunker Hill" occurred in the twenty years before and after the turn of the century and was characterized by the construction of Victorian mansions, hotels, and commercial real estate.
II. "The Decline of Bunker Hill" extended throughout the 1920s, 30s, and 40s as new construction projects were discouraged by the "Hill" residents. As a result, Bunker Hill was passed by, while other construction projects were completed in the downtown area.
III. "The Studies and Planning" period started after World War II. Encouraged by the California Community Redevelopment Law and Federal Housing Acts of 1946 and 1949, a redevelopment plan was finally adopted for Bunker Hill in 1959.
IV. "The Start of Implementation" of the redevelopment process took place in the 1960s. Acquisition, relocation, and site clearance occurred during the first five years, followed by the construction of the first four new developments and a new street system.
V. "The Signing Years" of the 1970s resulted in as many as 14 agreements for office, hotel, and housing development projects, of which five were constructed within the decade. Transportation measures to handle future traffic concerns were also pursued.
VI. "The Building Boom" of the 1980s saw an explosion of over a dozen office, residential and hotel projects constructed particularly on the hilltop. Bunker Hill redevelopment funds also helped to facilitate the construction of thousands of low and moderate income housing units throughout the city.
VII. "The Recession" of the 1990s halted the construction of many office buildings. Fortunately, one hotel and an apartment building still underwent construction and the historic Angel's Flight Railway was restored.
Scope and Content
The collection consists of items related to the redevelopment of Bunker Hill: legal documents, reports, studies, brochures, proposals, serials, books, photographs, design proposals, and Community Redevelopment Agency studies. Also found within the collection are planning documents and other related materials concerning surrounding downtown areas: Central City East, South Park, Financial District, Historic Core (including the Broadway Corridor), Seventh Street Retail Development, and various housing, tourism, retail, and transportation reports.
Administrative Information
Publication Information
USC Libraries Special Collections
August 2010
Doheny Memorial Library 206
3550 Trousdale Parkway
Los Angeles, California, 90089-0189
213-740-5900
specol@usc.edu
Conditions Governing Access
COLLECTION STORED OFF-SITE. Advance notice required for access.
Conditions Governing Use
The collection contains published articles; researchers are reminded of the copyright restrictions imposed by publishers on reusing their articles and parts of books. It is the responsibility of researchers to acquire permission from publishers when reusing such materials. The copyright to unpublished materials belongs to the heirs of the writers. Permission to publish, quote, or reproduce must be secured from the repository and the copyright holder.
Acquisition
The Bunker Hill Redevelopment Project was given to the University of Southern California, in 1999 by Yukio Kawaratani, the principal downtown planner for the Community Redevelopment Agency of the City of Los Angeles, California.
Controlled Access Headings
Corporate Name(s)
- Bunker Hill Urban Renewal Project. -- Archives
- Central Business District Redevelopment Project (Los Angeles, Calif.). -- Archives
Genre(s)
- Brochures
- Legal documents
- Photographs
- Reports
Geographic Name(s)
- Bunker Hill (Los Angeles, Calif.)-Archives
Personal Name(s)
- Kawaratani, Yukio
Subject(s)
- City planning--California--Los Angeles--Archival resources
- City planning--California--Los Angeles--History--20th century--Archival resources
Collection Inventory
Series 1: Subject Files 1938-1997ArrangementOriginal order was kept when filing the materials. The parcel number/letter was assigned by the Community Redevelopment Agency to help keep track of a particular site or building within the Bunker Hill area. |
||||
| Box | Folder | |||
|
Bunker Hill Urban Renewal Project - Contract for Sale of Land for Private Development Parcels A, E-3, E-4, L & M - by and between the Community Redevelopment Agency and Shapell Government Housing, Inc. and Goldrich & Kest Inc. a joint venture 1978 January 30 Scope and Contents noteScope of development approximately 800 apt units on 5 sites totaling 13.67 acres. |
1 | 1 | ||
|
Housing Development Opportunity - Bunker Hill by the Community Redevelopment Agency- Parcel A, E-3, E-4, L & M 1976 November 5 Scope and Contents noteAnnouncement of development, 23 pages plus site maps. |
1 | 2 | ||
|
Noise Assessment Proposed Condominium Development on Parcel A of the Bunker Hill Redevelopment Project, City of Los Angeles prepared by J.J. Van Houten & Associates- Parcel A, E-3, E-4, L & M 1982 August 27 Scope and Contents noteProject #1172-82, 44 pages. |
1 | 3 | ||
|
Kamnitzer Cotton Vreeland- Parcel A, E-3, E-4, L & M 1975 Scope and Contents noteArchitects for Promenade Towers includes a book showing their projects. |
1 | 4 | ||
|
Promenade Towers: A City within a City- Parcel A, E-3, E-4, L & M undated Scope and Contents noteLeasing brochure with floor plans. |
1 | 5 | ||
|
Participation/Development Agreement with Fidelity Group Inc. 1976 July 19 |
1 | 6 | ||
|
Bunker Hill: Parcel C- A Luxury Hotel prepared by Ridgway Development Ltd. 1974 January 22 Scope and Contents noteDevelopment proposal (synopsis of previous work). |
1 | 7 | ||
|
Reuse Appraisal Update, Parcel C, Bunker Hill Urban Renewal Project prepared by Property Evaluation Services 1976 December 20 Scope and Contents noteResults of field inspection, data research, and appraisal analyses. |
1 | 8 | ||
|
Report of Potential Market Demand and Statement of Estimated Annual Operating Results for a Proposed Hotel on Parcel C in Bunker Hill Redevelopment Area of Los Angeles prepared by the Harris, Kerr, Forster and Co (CPAs) for the Americana Hotels and MAT Associates 1977 March 2 Scope and Contents noteReport on site location, economic environment, rooms supply and demand, etc. |
1 | 9 | ||
|
Bunker Hill Hotel - Parcel C prepared by MAT Associates Developers Archisystems, Architects and Engineers 1977 May Scope and Contents notePreliminary designs. |
1 | 10 | ||
|
The Sheraton Grande Hotel Los Angeles- Parcel C 1982 August Scope and Contents noteHotel advertising brochure and conference facilities guide. |
1 | 11 | ||
|
Maxwell Starkman AIA and Associates- Parcel C 1979 December 7 Scope and Contents noteArchitectural projects and company profile (loose leaf). |
1 | 12 | ||
|
Bunker Hill Square prepared by the Connecticut General Life and Galbreath-Ruffin Corporation- Parcel D 1965 Scope and Contents noteOffice leasing brochures: 2 large and 1 small. |
1 | 13 | ||
|
The Promenade prepared by Shapell Government Housing and Goldrich Kest- Parcel E-3 and E-4 1981 January 1 Scope and Contents noteSales/leasing brochure. |
1 | 14 | ||
|
The Promenade West prepared by Shapell Government Housing and Goldrich Kest- Parcel E-3 and E-4 undated Scope and Contents note121 S Hope, Sales/leasing brochure. |
1 | 15 | ||
|
Feasibility Analysis: Parking Structure - Retail Complex (Disposition Parcel F) prepared by the Development Research Associates 1965 January 11 |
1 | 16 | ||
|
Bunker Hill Development Information - Parcel F prepared by the Community Redevelopment Agency 1969 February Scope and Contents noteDevelopment offering package. |
1 | 17 | ||
|
Bunker Hill Center prepared by the Boise Cascade Urban Development- Parcel F 1971 March Scope and Contents noteDevelopment proposal package. |
1 | 18 | ||
|
Los Angeles World Trade Center - The Focal Point of Pacific Basin Trade by the LA World Trade Center- Parcel F undated Scope and Contents noteOffice and retail leasing brochure, 5 pp. |
1 | 19 | ||
|
Unicon Update: A Pictorial Review of Recent Projects of Unicon Parking Structures Inc. prepared by Unicon Parking Structures- Parcel F 1976 April Scope and Contents noteAdvertising brochure with Trade Center on cover. |
1 | 20 | ||
|
Bunker Hill Hotel prepared by John Portman and Associates- Parcel G undated Scope and Contents noteBound photos of models and plans for Bonaventure Hotel. |
1 | 21 | ||
|
For Los Angeles A Great New Western International Hotel prepared by Western International Hotels- Parcel G undated Scope and Contents notePromotional brochure with photos of model and sketches. |
1 | 22 | ||
|
Los Angeles Bonaventure Meeting and Convention Planner prepared by Western International Hotels- Parcel G undated Scope and Contents notePromotional brochure with floor layouts and room sizes. |
1 | 23 | ||
|
Westin Bonaventure prepared by the Los Angeles Bonaventure Company- Parcel G 1985 September 4 Scope and Contents notePress kit w/photos, announcement of Flower St entrance. |
1 | 24 | ||
|
Los Angeles Bonaventure Hotel - Public Area Artwork prepared by John Portman and Associates- Parcel G undated Scope and Contents noteNotebook binder of locations and types of artwork. |
1 | 25 | ||
|
John Portman and Associates/Portman Properties by John Portman and Associates- Parcel G undated Scope and Contents noteColor photo catalog of their projects. |
1 | 26 | ||
|
Security Pacific National Bank: Press Material by the Security Pacific National Bank- Parcel I 1971 May Scope and Contents noteGround breaking ceremonies. |
1 | 27 | ||
|
Consent to Assignment and Association prepared by the Community Redevelopment Agency- Parcel J-1 1978 June 27 |
1 | 28 | ||
|
Proposed fine art works for parcel J-1 undated Scope and Content5 8"x10" photos |
1 | 29 | ||
|
A Public Park Concept for the Roof Deck of the Atlantic Richfield Plaza Parking Garage prepared by Charles Kober and Associates- Parcel J-2 1978 March General noteJ-2 |
1 | 30 | ||
|
YMCA press kit prepared by the YMCA Central City Development Committee- Parcel J-2 1982 Scope and ContentPress kit for proposed downtown YMCA. |
1 | 31 | ||
|
Stuart M. Ketchum - Downtown YMCA by YMCA of Metropoitan LA- Parcel J-2 1986 General noteJ-2 Scope and Contents noteChronicle of Downtown YMCA. |
1 | 32 | ||
|
Annual Program Report prepared by Stuart M. Ketcham - Downtown YMCA- Parcel J-2 1987 October General noteJ-2 |
1 | 33 | ||
|
Request for Development Proposals - First Street Properties, Downtown LA, Corporate Office Tower prepared by LA County- Parcel K, Q and W-2 1988 March 4 Scope and Contents noteDevelopment offering packet in color, for portion of Parcel Q. |
1 | 34 | ||
|
Draft Environmental Impact Report prepared for the County of Los Angeles and the Community Redevelopment Agency by Michael Brandman Associates- Parcel K, Q and W-2 1990 May |
1 | 35-36 | ||
|
Proposed Eighth Implementation Agreement to Contract for Sale of Land for Private Redevelopment of Parcel L and M between Central Redevelopment Agency and Grand Promenade, LTD- Parcel l and M 1985 December Scope and Contents noteUpdates original agreement for BH Parcels A, E-3, E-4, L and M signed in 1978. |
1-2 | 37, 1 | ||
|
Parcel L Condominiums by Kamnitzer Cotton Vreeland 1982 January 29 Scope and Contents noteNotebook of 8x10 photos of design model. |
2 | 2 | ||
|
Slick System Pays Off in Productivity by Karl P. KellerK- Parcel P-2 1983 April Scope and Contents noteReprint from publication: Building Design and Construction about 400 S Hope project. |
2 | 3 | ||
|
Feasibility Study - Elderly High-Rise Complex Bunker Hill Market Area prepared by Walker and Lee Real Estate Research and Consulting 1975 November 5 Scope and Contents noteMarket feasibility study for Parcels X and Y. |
2 | 4 | ||
|
Senior Citizen Housing and Multipurpose Social Service Center prepared by the Bunker Hill Retirement Housing Foundation and Central Redevelopment Agency 1976 October 12 General noteX-2 (b) Scope and Contents noteReport to Carla A. Hills of HUD explaining project /seeking support. |
2 | 5 | ||
|
Bunker Hill Elderly Housing Project prepared by Daniel L. Dworsky, FAIA and Associates undated General noteX-2 (b) Scope and Contents note24 pages of schematic design studies in color. |
2 | 6 | ||
|
Executive Summary - Senior Citizen Housing and Multipurpose Social Service Center on Bunker Hill prepared by the Bunker Hill Retirement Housing Foundation 1976 October 12 General noteX-2 (b) |
2 | 7 | ||
|
Agreement to Contract for Sale of Land for Private Development - Parcel A Bunker Hill Urban Renewal Project- Parcel A, E-3, E-4, L & M 1983 April 12 Scope and Contents notePromenade Towers 123 S Figueroa. |
2 | 8 | ||
|
Bunker Hill Urban Renewal Project - Contract for Sale of Land for Private Development Parcel B by and between Central RA and Fidelity Group, Inc.- Parcel B 1976 April Scope and Contents noteScope of development: low to medium-rise office development of about 222,000 sq ft of floor area. |
2 | 9 | ||
|
Bunker Hill Urban Renewal Project - Parcel C - by and between CRA and MAT Associates, a limited partnership- 1977 October 24 General note(legal document) Scope and Contents noteScope of development: hotel complex of 500 rooms. |
2 | 10 | ||
|
Disposition and Development Agreement between CRA and Connecticut General Life Insurance Co for Parcel D 1965 March Scope and Contents noteScope of development: approximately 40-story office bldg with about 620,000 sq ft space, located above an elevated plaza. |
2 | 11 | ||
|
Bunker Hill Urban Renewal Project Parcel E - Residential Towers / Disposition and Development Agreement between CRA and City Reconstruction Corp and Bunker Hill Redevelopment Co. 1965 May General note(legal document) Scope and Contents noteScope of development: 1200-1750 dwelling units in high, medium, and low rise bldgs with recreation and open space. |
2 | 12 | ||
|
Bunker Hill Parcel E Grant Deed, Agreement containing Covenants affecting real property, and Amendment to Agreement containing covenants affecting real property with City Reconstruction Company 1965 General note(legal documents) Scope and Contents note2 copies of Grant Deed only. |
2 | 13 | ||
|
The Promenade prepared by Kamnitzer Cotton Vreeland- Parcel E-3, E-4 1977 August 29 Scope and Contents noteScope of development: E-3 - 140 dwelling units, E-4 - 135 dwelling units. Sponsors: Shapell Government Housing, Inc. and Goldrich Kest and Assoc - preliminary design drawings. |
2 | 14 | ||
|
Bunker Hill Urban Renewal Project Parcel F - Disposition and Development Agreement by and between CRA and Boise Cascade Urban Development Corp and Boise Cascade Home & Land Corp (developer) 1970 May 25 General note(legal document) Scope and Contents noteScope of development: 250,000 sq ft commercial development with 2-story rooftop open space and up to 50-ft high subordinate buildings. |
2 | 15 | ||
|
Agreement Implementing and Interpreting the Disposition and Development Agreement with Boise Cascade Urban Development Corporation- Parcel F 1971 May 27 General note(legal document) Scope and Contents noteRevised scope of development: no rooftop higher than 5 stories, with one 13-story bldg covering 25% of site. |
2 | 16 | ||
|
Second Agreement Implementing and Interpreting the Disposition and Development Agreement- Parcel F 1973 March 27 General note(legal document) Scope and Contents noteConfirms assignment from Boise Cascade to Bunker Hill Center Associates, headed by Edward K. Rice. Revised scope of development: to provide for 4 pedestrian bridges and secondary transit lines and station. |
2 | 17 | ||
|
Third Implementation Agreement between the Community Redevelopement Agency and Bunker Hill Center Associates- Parcel F 1974 December 31 General note(legal document) |
2 | 18 | ||
|
Bunker Hill Urban Renewal Project Parcel G - Disposition and Development Agreement by and between CRA and Los Angeles Portman Company (developer) 1974 August 7 General note(legal document) Scope and Contents noteScope of development: hotel with at least 1000 guest rooms and at least 28-story with elevated south plaza. |
2 | 19 | ||
|
Global Architecture 57- Parcel G 1981 Scope and Contents notePeriodical featuring Portman work in Atlanta and LA. |
2 | 20 | ||
|
Global Architecture 28- Parcel G 1974 Scope and Contents notePeriodical featuring Portman work in Atlanta, Chicago and San Francisco. |
2 | 21 | ||
|
Disposition and Development Agreement between CRA and Dillingham Corporation- Parcel G 1969 March 5 General note(legal document) |
2 | 22 | ||
|
Disposition and Development Agreement between CRA and Central Plants, Inc.- Parcel H 1966 March 14 General note(legal document) Scope and Contents noteScope of development: central heating and cooling plant designed and developed to create a park-like treatment of the site. |
2 | 23 | ||
|
Amended Owner-Participation Agreement by and between CRA and Stuart K. Oliver & Ruth H. Oliver and Caltech Petroleum Investment Corp and Security Pacific National Bank- Parcel I 1970 October 9 General note(legal document) Scope and Contents noteScope of development: 1.6 million sq ft in a 50-story office bldg with landscaped plaza. |
2 | 24 | ||
|
Agreement Containing Covenants Affecting Real Property in Connection with the Certificate of Completion- Parcel I 1984 September General note(legal document) |
2 | 25 | ||
|
Disposition and Development Agreement by and between CRA and John S. Griffith & Co.- Parcel J-1 1971 March 5 General note(legal document) Scope and Contents noteScope of development: office tower4 at least 28-story and 500,000 sq ft of floor area. |
2 | 26 | ||
|
Assignment of Interest and Assumption of Duties of Developer in the Disposition and Development Agreement covering Parcel J-1 between Community Redevelopment Agency and John S. Griffith and McKeon Construction 1972 June 29 General note(legal document) |
2 | 27 | ||
|
Revised Schedule of Performance Parcel J-1 1974 October 16 General note(legal document) |
2 | 28 | ||
|
Implementation Agreement between Community Redevelopement Agency and Atlantic Richfield Co and McKeon Construction- Parcel J-1 1979 October 2 General note(legal document) |
2 | 29 | ||
|
Disposition and Development Agreement by and between CRA and Atlantic Richfield Co.- Parcel J-2 1968 September 23 General note(legal document) Scope and Contents noteScope of development: parking structure up to 2550 spaces, roof deck height limited to sidewalk at Hope and 4th and to be developed for recreational or other uses, and landscaped open space. |
2 | 30 | ||
|
First Implementation Agreement- Parcel J-2 1970 February 27 General note(legal document) Scope and Contents noteTo commence grading prior to conveyance of title. |
2 | 31 | ||
|
Second Implementation Agreement- Parcel J-2 1970 March 9 General note(legal document) Scope and Contents noteAdds Flower Street LTD as developer. |
2 | 32 | ||
|
Participation Agreement between CRA and YMCA of Metropolitan LA- Parcel J-2 1984 November 29 General note(legal document) Scope and Contents noteScope of development: fitness center complex with outdoor areas. |
2 | 33 | ||
|
First Implementation Agreement to Owner Participation Agreement by and among CRA and Walt Disney Concert Hall I, Inc.- Parcel K, Q and W-2 1991 July General note(legal document) Scope and Contents noteScope of development for Parcel K: Concert hall of 2500 seats, chamber music hall 1000 seats, hotel of up to 400 rooms, auxiliary office and retail space, and 3057 underground parking spaces. |
3 | 1 | ||
|
Parcels N and O Disposition and Development Agreement by and between CRA and Robert F. Maguire III 1979 June General note(legal document) Scope and Contents noteScope of development: Two office towers over 30 stories with low-rise structures, about 1.5 million sq ft floor area. |
3 | 2 | ||
|
Photographs of Proposed Fine Art for Parcels N and O (Crocker Center) undated Scope and Contents noteLarge loose-leaf binder, 8x10 photos, and a plan showing proposed locations. Artists: Robt Graham, Miro, Dubuffet, Hockney. |
3 | 3 | ||
|
Amended Owner Participation Agreement by and Between CRA and Olympia and York California Equities Corp and O'Melveny & Myers- Parcel P-2 1980 November 7 General note(legal document) Scope and Contents noteScope of development: office development of 625,000 sq ft, up to 40 stories, with a low-rise structure for commercial activity. |
3 | 4 | ||
|
400 S Hope St, Los Angeles, California by Olympia and York- Parcel P-2 1980 General noteP-2 Scope and Contents noteOffice leasing brochure. |
3 | 5 | ||
|
Owner Participation Agreement between CRA and Pacific Telephone and Telegraph- Parcel V 1959 June 29 General noteV General note(legal document) Scope and Contents noteSite on Grand Ave described as Exhibit A was to be for a telephone central office bldg of not less than 4 levels used in connection with the existing adjacent telephone central office bldg at 434 S Grand Ave. |
3 | 6 | ||
|
Amendment of Owner Participation Agreement with Pacific Telephone and Telegraph- Parcel V 1961 November 17 General noteV General note(legal document) Scope and Contents noteIncluded additional property described in Exhibit B and provided for the construction of a one-story alternate bldg and future construction of a multi-story parking structure to serve the telephone central office bldg nearing completion. |
3 | 7 | ||
|
Second Amendment to the Owner Participation Agreement with Pacific Telephone and Telegraph- Parcel V 1966 June 28 General noteV General note(legal document) Scope and Contents noteProvided for the construction of an 8-story addition to the previously constructed 8-story telephone office bldg and a micro-wave radio tower on the roof of the 16-story bldg. On remaining Exhibit B site parking, which is covered by temp interim parking. |
3 | 8 | ||
|
Contract for Sale of Land for Private Development by and between CRA and Retirement Housing Foundation- Parcel X and Y 1977 December 15 General noteX and Y General note(legal document) Scope and Contents noteScope of development: Phase I on Parcels X1 and Y1 about 764 senior dwelling units in 3 hi-rise bldgs and multi-purpose Social Service Center of 50,000 sq ft. Phase II on Parcel X2 to have about 350 dwelling units and 400 parking spaces. |
3 | 9 | ||
|
Implementation Agreement- Parcel X and Y 1978 December 18 General note(legal document) Scope and Contents noteProvided for financial aspects of the development, including HUD financing and agency participation. |
3 | 10 | ||
|
Second Implementation Agreement- Parcel X and Y 1981 May 5 General note(legal document) Scope and Contents noteRecognized that parcel split into 2 - X-2 (a) and X-2 (b). X-2 (a) w/an additional 332 units (Phase II). X-2 (b) prkg structure by another developer |
3 | 11 | ||
|
Third Implementation Agreement- Parcel X and Y 1981 May 6 General noteX and Y General note(legal document) |
3 | 12 | ||
|
Fourth Implementation Agreement- Parcel X and Y 1982 November 4 General note(legal document) |
3 | 13 | ||
|
Disposition and Development Agreement by and between CRA and Maguire Partners - Crocker Properties - South Tower- Parcel X-2 b(2) 1981 June 15 General note(legal document) Scope and Contents noteScope of development: Hill and 2nd prkg structure 700 spaces, finished rooftop landscaped plaza for Angeles Plaza residents. Easements and structural support for future 2-story health care facility and downtown people mover on roof deck. |
3 | 14 | ||
|
First Implementation Agreement- Parcel X-2 b(2) 1981 October 19 General note(legal document) Scope and Contents noteRevises completion schedule. |
3 | 15 | ||
|
Second Implementation Agreement- Parcel X-2 b(2) 1982 March 31 General note(legal document) Scope and Contents noteRevises completion schedule. |
3 | 16 | ||
|
Third Implementation Agreement- Parcel X-2 b(2) 1983 January 3 General note(legal document) Scope and Contents noteRevises completion schedule and includes delivery dates for specific portions of structure to the adjacent land owner. |
3 | 17 | ||
|
Owner-Participation Agreement between CRA and Times-Mirror Corporation- Parcel W-1 1959 June 29 General noteW-1 General note(legal document) |
3 | 18 | ||
|
California Performing Arts Plaza by BH Associates- Parcel R, S, T, U, Y-1 1982 July 2 Scope and Contents notePreliminary outline operating plan. |
3 | 19-20 | ||
|
California Plaza Los Angeles by BH Associates- Parcel R, S, T, U, Y-1 1983 Scope and Contents noteLeasing brochure. |
3 | 21 | ||
|
Isozaki: At the Moment, the Best Architect in California Is from Japan by Charles Fleming- Parcel R, S, T, U, Y-1 1986 March Scope and Contents noteCopy from California Magazine, pp 83-89, 91, 119. |
3 | 22 | ||
|
Memorandum concerning developer selection by BH Task Force Majority Report- Parcel R, S, T, U, Y-1 1980 July 14 Scope and Contents note39 pp brochure, recommending BH Associates. |
3 | 23 | ||
|
BH Associates: California Center by BH Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteBoxed set 4: Site Plan Concept, Phasing / Original. |
3 | 24 | ||
|
BH Associates: California Center by BH Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteBoxed set 4: California Center folder w/ press release, correspondence, 8x10 photos of drawings, HUD Redevelopers form 6004, etc. |
3 | 25 | ||
|
The Angeles Plaza fact sheet by BH Corporation- Parcel X-2(b) undated Scope and Contents note3 pp |
3 | 26 | ||
|
Final Environmental Impact Statement - Bunker Hill Elderly Housing Project by HUD- Parcel X-2(b) 1977 July |
3 | 27 | ||
|
Disposition and Development Agreement between CRA and Bunker Hill Associates, a Limited Partnership- Parcel R, S, T, U, Y-1 1981 September 30 General note(legal document) Scope and Contents noteScope of development: 5 parcels 11.21 acres, 3.2 million sq ft office in 3 towers 37-60 stories. Minimum 750 residential, 450 hotel, 160,000 sq ft commercial retail, MCA, central performance plaza, landscaping. |
3-4 | 28-29, 1-3 | ||
|
A Grand Avenue: The Maguire Partners Proposal by Maguire Partners- Parcel R, S, T, U, Y-1 1980 February Scope and Contents noteXerox copy of proposal for Bunker Hill. |
4 | 4 | ||
|
Restated Disposition and Development Agreement (as amended 2/83) Incorporating First Amendment- Parcel R, S, T, U, Y-1 1983 February General note(legal document) |
4 | 5 | ||
|
Attachments to Restated Disposition and Development Agreement- Parcel R, S, T, U, Y-1 1983 February General note(legal document) |
4 | 6-9 | ||
|
First Amendment to Disposition and Development Agreement- Parcel R, S, T, U, Y-1 1983 April General note(legal document) Scope and Contents noteMetropolitan Structures (Met Life Insurance) becomes general partner in BH Assoc, development to take place in 8 separate phases. |
4 | 10 | ||
|
California Plaza Retail Analysis prepared by Larry Smith and Company Ltd.- Parcel R, S, T, U, Y-1 1982 July |
4 | 11 | ||
|
Museum of Contemporary Art Outline Specifications by Arata Isozaki Assoc, Gruen Assoc, John A. Martin and Assoc, Syska and Hennessy, Darby Sanchis and Assoc- Parcel R, S, T, U, Y-1 1983 July 22 |
4 | 12 | ||
|
Arthur Erickson Selected Projects 1971-1985 by Barbara E. Shapiro (curator)- Parcel R, S, T, U, Y-1 1985 Scope and Contents noteExhibition catalog. |
4 | 13 | ||
|
Board Briefs newsletter by the Community Redevelopment Agency- Parcel R, S, T, U, Y-1 1980 March 24 Scope and Contents note10 pp summary of 5 major proposals for the development. |
4 | 14 | ||
|
Museum Towers prepared by Museum Tower- Parcel R, S, T, U, Y-1 undated Scope and Contents noteSmall leasing brochure. |
4 | 15 | ||
|
LA City council Approves Huge California Plaza Project for Bunker Hill; Work to Start Next Fall by the Bunker Hill Associates- Parcel R, S, T, U, Y-1 1982 January 19 Scope and Contents notePress release. |
4 | 16 | ||
|
Development Offering Remaining 8.75 Acres of Bunker Hill by the Community Redevelopment Agency- Parcel R, S, T, U, Y-1 1980 |
4 | 17 | ||
|
Reuse Appraisal for Parcels RSTU and Y-1 prepared by Keyser Marston and Associates- Parcel R, S, T, U, Y-1 1981 October |
4 | 18 | ||
|
Bunker Hill press release with 8x10 photos prepared by Metropolitan Structures- Parcel R, S, T, U, Y-1 undated |
4 | 19 | ||
|
Music Center Progress Report- Parcel R, S, T, U, Y-1 undated Scope and Contents noteFund raising brochure. |
5 | 1 | ||
|
California Center Environmental Impact Report prepared by the Community Redevelopment Agency of Los Angeles- Parcel R, S, T, U, Y-1 1981 September |
5 | 2 | ||
|
California Center proposal submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 1981 January 20 Scope and Contents noteXerox copy handout of item #116 |
5 | 3 | ||
|
California Center press release submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 1980 March 5 |
5 | 4 | ||
|
Maguire Partners press release by Maguire Partners- Parcel R, S, T, U, Y-1 1980 February 29 |
5 | 5 | ||
|
Five developers' proposals- Parcel R, S, T, U, Y-1 undated Scope and Contents note8 1/2 x 11 drawing copies |
5 | 6 | ||
|
Ralph Jackson and Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents note8x10 photos of models and drawings, news releases about proposal, Cabot, Cabot and Forbes. |
5 | 7 | ||
|
Olympia and York - Trizec- Parcel R, S, T, U, Y-1 undated Scope and Contents note8x10 photos of drawings and a press release. |
5 | 8 | ||
|
Cabot, Cabot and Forbes- Parcel R, S, T, U, Y-1 undated Scope and Contents note8x10 and 10x14 photos of site plans and building sections. |
5 | 9 | ||
|
Central City East, Los Angeles - An Evaluation of Policy Strategies for Single-Room Occupancy Hotels Report prepared by the Urban Land Institute 1987 July 19-24 Scope and Content42 pp report. |
5 | 10 | ||
|
To Build a Community: Report on the Mayor's Citizens' Task Force on Central City East by the Mayor's Citizens' Task Force 1988 May Scope and Content42 pp report. |
5 | 11 | ||
|
Briefing Report: Central City East, Central Business District Redevelopment Project by the CRA Housing Committee 1991 May |
5 | 12 | ||
|
Briefing Report Appendices: Central City East, Central Business District Redevelopment Project by the CRA Housing Committee 1991 May Scope and Contents noteContents: ULI report (same as item #151, 5/88 Mayor's Citizens' Task Force (same as item #152, Workshop on Homelessness (item #156 ), Economic Base Study, and International Downtown Association Award. |
5 | 13 | ||
|
The Changing Face of Misery: Los Angeles' Skid Row Area in Transition, Volume V: Study Overview and Implications prepared by Hamilton, Rabinovitz and Altschuler Inc. for Community Redevelopment Agency 1988 April |
5 | 14 | ||
|
Workshop on Homelessness by the Downtown Strategic Plan Advisory Committee 1990 May 10 |
5 | 15 | ||
|
Social Impact Evaluation of Central City East: Study of the Central Division Facility - Police Building Impacts on the Skid Row Community prepared by SET - Social Engineering Technology for the Community Redevelopment Agency 1978 |
5 | 16 | ||
|
Economic and Financial Situation of Los Angeles Single Room Occupancy Hotels prepared by HR and A - Hamilton, Rabinovitz and Altschuler for Rent Stabilization Division for Community Redevelopment Agency 1989 April |
5 | 17 | ||
|
Briefing Package: South Park by the Community Redevelopment Agency 1990 Scope and Contents note3-ring binder |
5 | 18 | ||
|
South Park: A Compelling Vision prepared by the Community Redevelopment Agency circa 1991 |
5 | 19 | ||
|
South Park brochure prepared by the Community Redevelopment Agency 1992 June |
5 | 20 | ||
|
South Park: A Downtown Community prepared by the Community Redevelopment Agency 1982-1983 Scope and Contents note2 copies 9/1982, 2 revised copies 10/1983" |
5 | 21 | ||
|
South Park: An Evaluation of Residential Development Potential and Strategies for the South Park Area of Downtown LA prepared by the Urban Land Institute 1985 September 9-13 Scope and Content47 pp report. |
5 | 22 | ||
|
RFP: South Park Housing, Phase III prepared by the Community Redevelopment Agency 1986 March |
5 | 23 | ||
|
RFP: South Park Rental Housing, New Construction prepared by the Community Redevelopment Agency 1985 July |
5 | 24 | ||
|
Los Angeles Convention Center - Phase II Architectural Proposal prepared by Gruen Associates/I. M. Pei and Partners 1986 May 16 |
5 | 25 | ||
|
RFP: South Park Housing, Phase III prepared by the Community Redevelopment Agency 1991 |
5 | 26 | ||
|
Los Angeles Convention Center Expansion: Hotel/Exhibit Hall Master Plan Study prepared by Gruen Associates/ Pei Cobb Freed and Partners 1990 December |
5 | 27 | ||
|
Los Angeles Convention Center Expansion Project Report prepared by Convention Center Area Task Force 1992 November |
5 | 28 | ||
|
Historic Core: Central Business District Redevelopment Project by the Community Redevelopment Agency 1993 Scope and Contents noteFolders with map and project status. |
5 | 29 | ||
|
Palaces of Finance: A Walking Tour of Spring Street Historic District co-sponsored by the LA Conservancy and Spring Street Association 1983 |
5 | 30 | ||
|
Los Angeles Actor's Theatre Performing Arts Center, Urban Development Action Grant application prepared by the Community Redevelopment Agency 1982 July |
5 | 31 | ||
|
Ronald Reagan Building prepared by the State of California 1990 October Scope and Contents noteBrochure commemorating opening of building. |
5 | 32 | ||
|
State Building Expansion Facility: The Broadway Centre, 320 West 4th prepared by the Community Redevelopment Agency 1991 |
5 | 33 | ||
|
First and Broadway Site: Invitation for Development Proposals by the State, County, and City 1986 |
5 | 34 | ||
|
Broadway Consumer and Business Survey prepared by the Wilshire Organization for Community Redevelopment Agency 1985 January |
5 | 35 | ||
|
Broadway Retail Trade Area Analysis - Executive Report prepared by Linda S. Coughlin and Associates for Community Redevelopment Agency 1988 December 15 |
5 | 36 | ||
|
The Secretary of the Interior's Standards for Historic Preservation Projects (with application standards) 1979 |
6 | 1 | ||
|
Earthquake Hazard Reduction: Cumulative Impacts on Historic Buildings, A Critical Issues Study prepared by the Community Redevelopmeny Agency and LA Conservancy 1986 Scope and Contents noteSame as item #245, carton 9" |
6 | 2 | ||
|
Broadway Theatres Entertainment District Study prepared by Kosmont & Assoc, Levin & Assoc, and others, for Community Redevelopment Agency 1995 May |
6 | 3 | ||
|
Broadway Historic Theater District: A Walking Tour prepared by LA Conservancy 1986 |
6 | 4 | ||
|
RFP: Broadway Theatres Entertainment District, Program Development and Implementation Plan prepared by the Community Redevelopment Agency 1992 |
6 | 5 | ||
|
Spring Street Times prepared by the Community Redevelopment Agency 1987-1989 Scope and Contents noteNewsletter/brochures, 1 copy-1987, 2 copies-1988, 1 copy-1989. |
6 | 6 | ||
|
Society of Architectural Historians, Southern California Chapter Spring Street Newsletter 1980 December |
6 | 7 | ||
|
Biddy Mason's Place: A Midwife's Homestead by Dolores Hayden 1988 Scope and Contents notePoster for The Power of Place project. |
6 | 8 | ||
|
The Architects: Gruen Associates catalog submitted by Bunker Hill Associates undated General noteR, S, T, U, Y-1 Scope and Contents noteRemoved from box set 1 |
6 | 9 | ||
|
The Architects: Kamnitzer Cotton Vreeland catalog submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Removed from box set 1. |
6 | 10 | ||
|
The Architects: Arthur Erickson Architects small brochure submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 1. |
6 | 11 | ||
|
Developers: Cadillac Fairview: A Portfolio of Properties submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 2. |
6 | 12-13 | ||
|
Developers: Cadillac Fairview Annual Report submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 1980 Scope and Contents noteRemoved from box set 2. |
6 | 14 | ||
|
The Consultants Syska and Hennessy Engineers submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 1979 Scope and Contents noteRemoved from box set 3. |
6 | 15 | ||
|
The Consultants POD Inc, landscape architecture portfolio submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 16 | ||
|
The Consultants Larry Smith and Co Inc submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 17 | ||
|
The Consultants Sol Arc, Architecture and Energy Consulting submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 18 | ||
|
The Consultants Barton-Aschman Assoc, Western Regional Offices submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 19 | ||
|
The Consultants CinePlex movie theaters submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 20 | ||
|
The Consultants: Barton-Aschman into the '80s submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 21 | ||
|
The Consultants: The George Lang Corp submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 22 | ||
|
The Consultants Henry C. Beck and Co, General Contractors submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 23 | ||
|
The Consultants: Martin and Associates submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 24 | ||
|
The Consultants: Proposal from the Bella Lewitsky Dance Company for the Dance Gallery to be included in California Center submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
6 | 25 | ||
|
ALL Disposition Agreements for Bunker Hill parcels undated Scope and Contents note3-ring binder |
6 | 26-27 | ||
|
Skid Row news clippings 1980-1986 Scope and Contents note3-ring binder |
6-7 | 28, 1 | ||
|
777 Tower, Cesar Pelli & Associates undated Scope and Contents noteOffice leasing brochure. |
7 | 2 | ||
|
801 Tower, The Architects Collaborative (TAC) undated Scope and Contents noteoffice leasing brochure |
7 | 3 | ||
|
Wholesale Produce Market - UDAG application 1980 July Scope and Contents note3-ring binder |
7 | 4-5 | ||
|
ULI Briefing package for panel analysis of LA CBD Retailing prepared by the Community Redevelopment Agency 1978 June Scope and Contents note3-ring binder, contains 2 more copies of item #276" |
7 | 6-7 | ||
|
Atlantic Richfield Plaza prepared by Albert C. Martin and Associates circa 1970s Scope and Contents noteoffice leasing brochure |
7 | 8 | ||
|
Chase Plaza prepared by Gin Wong &: Associates undated Scope and Contents noteoffice leasing brochure |
7 | 9 | ||
|
Home Savings Tower by Albert C. Martin & Associates 1986 Scope and Contents noteschematic drawings |
7 | 10 | ||
|
515 South Figueroa by Albert C. Martin & Associates ca. 1980s Scope and Contents noteoffice leasing brochure |
7 | 11 | ||
|
Hyatt Regency Los Angeles by Charles Luckman and Associates undated Scope and Contents notehotel leasing brochure |
7 | 12 | ||
|
1000 Wilshire Building by Reliance Development Group, Inc. Kohn Pedersen Fox and Langdon Wilson Mumper 1984 Scope and Contents noteoffice leasing brochure |
7 | 13 | ||
|
Seventh Street: Mecca for Merchants - A Walking Tour prepared by LA Conservancy 1970 |
7 | 14 | ||
|
Open Space Downtown: A Citizen Task Force Case Study Report on Citicorp Plaza prepared by the Community Redevelopment Agency 1990 November |
7 | 15 | ||
|
Central Library: Documentation and Pre-Demolition Salvage of Artwork (historic preservation grant application A) 1984 December |
7 | 16-17 | ||
|
Central Library: Pre-Construction Stabilization of Painted Artwork (historic preservation grant application B) for History Room and Rotunda murals, stenciling 1984 December |
7 | 18-19 | ||
|
Central Library: Supplement to the Environmental Impact Report (renovation and expansion) prepared by the Community Redevelopment Agency 1985 March |
7 | 20 | ||
|
Guidelines for Preservation, Restoration, and Alterations to the Central Library of Los Angeles a report by the Southern California Chapter/ American Institute of Architects Library Study Team 1978 September |
8 | 1-2 | ||
|
Executive Summary: Final Environmental Impact Report Central Library Renovation and Expansion prepared by the LA Bureau of Engineering 1978 July |
8 | 3 | ||
|
Concept for Saving and Expanding the Central Library by Charles Luckman Associates 1977 March Scope and Contents notefolder of presentation materials |
8 | 4 | ||
|
Summary of Status of New Central Library Project and CLA's Comments on CRA Report Adopted 8/18/76, prepared by Charles Luckman Associates 1976 September 16 |
8 | 5 | ||
|
Broadway/Central Library: Impact Analysis prepared by Charles Kober Associates for Community Redevelopment Agency 1976 August |
8 | 6 | ||
|
The Public Research Library of the Future by the Office of Academic Planning, USC 1975 July Scope and Contents notereport of study, includes loose: chronology of Events Dealing with Problems of the Central Library Bldg, LA" |
8 | 7 | ||
|
Analysis of the Usage of the Central Library of the Los Angeles Public Library prepared by J. Cushman and R.M. Hayes, Institute of Library Research 1968 October 14 |
8 | 8 | ||
|
Produce Market Planning and Implementation Program prepared by The Arroyo Group 1976 |
8 | 9 | ||
|
Wholesale Produce Market - UDAG application, volume I 1978 June 1 |
8 | 10 | ||
|
Wholesale Produce Market - UDAG application, volume II 1978 June 1 |
8 | 11 | ||
|
Wholesale Produce Market - UDAG application, volume III (summary report) 1978 June 1 |
8 | 12 | ||
|
Wholesale Produce Market - Title IX Implementation Grant amended application 1978 August 1 |
8 | 13-14 | ||
|
Los Angeles Wholesale Produce Market: Project Manual prepared by The Arroyo Group 1979 May 1 |
8 | 15-16 | ||
|
Adjustment Strategy for Revitalization of the Los Angeles Wholesale Cut Flower Market by Wilsey & Ham for City Economic Development Office 1976 December |
8 | 17 | ||
|
Adjustment Strategy for Revitalization of the Los Angeles Wholesale Cut Flower Market, includes EIR by Wilsey & Ham for City Economic Development Office 1976 December |
8 | 18 | ||
|
Downtown Los Angeles Seafood and Related Industry Market Study by West Coast Fisheries Development Foundation for CRA 1987 December |
8 | 19 | ||
|
The CBD-Based Apparel Industry: Conclusions, Recommendations and Suggestions for Further Investigation by Mayor's Ad Hoc Committee for Special Study of the Apparel Industry, with CRA 1979 March 27 |
8 | 20 | ||
|
Jewelry Mart Proposal - Urban Development Action Grant application, part 1 original application Community Redevelopment Agency 1978 April |
8 | 21 | ||
|
Jewelry Mart Proposal - Urban Development Action Grant application, part 2 supplemental material by the Community Redevelopment Agency 1978 September |
8 | 22 | ||
|
Citizen Report: Summary of Initial CBD Redevelopment Implementation Activities by the Project Advisory Committee and City Wide citizens Advisory Committee 1977 June |
8 | 23 | ||
|
Proposed Initial Annual Work Program for the CBD Redevelopment Project: Executive Summary by the Community Redevelopment Agency 1977 July 28 |
8 | 24 | ||
|
Proposed Second Annual Work Program for the CBD Redevelopment Project Community Redevelopment Agency 1977 October 1 |
8 | 25 | ||
|
Proposed Third Annual Work Program for the CBD Redevelopment Project Community Redevelopment Agency 1978 October 1 |
8 | 26 | ||
|
Proposed Fourth Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1980 January |
9 | 1 | ||
|
Proposed Fifth Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1981 July 1 -1982 June 30 |
9 | 2 | ||
|
Sixth Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1982 July 1-1983 June 30 |
9 | 3 | ||
|
Seventh Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1983 July 1 -1984 June 30 |
9 | 4 | ||
|
Eighth Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1984 July 1 -1985 June 30 |
9 | 5 | ||
|
Ninth Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1985 July 1 -1986 June 30 |
9 | 6 | ||
|
Tenth Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1986 July 1 -1987 June 30 |
9 | 7 | ||
|
Eleventh Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1987 July 1 -1988 June 30 |
9 | 8 | ||
|
Twelfth Annual Work Program for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1988 July 1 -1989 June 30 |
9 | 9 | ||
|
Biennial Report for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1986 April |
9 | 10 | ||
|
Biennial Report for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1986-1988 |
9 | 11 | ||
|
Biennial Report for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1988-1990 |
9 | 12 | ||
|
Biennial Report for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1992 |
9 | 13 | ||
|
Redevelopment Plan for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1975 Scope and Contents noteOrdinance #147,480 adopted by City Council 18 July 1975" |
9 | 14 | ||
|
Final Environmental Impact Statement for the Central Business District Redevelopment Project prepared by the Community Redevelopment Agency of Los Angeles 1978 December |
9 | 15-16 | ||
|
Downtown Strategic Plan Los Angeles prepared by the Downtown Strategic Plan Advisory Committee 1993 |
9 | 17 | ||
|
Los Angeles Downtown Strategic Plan Final Draft prepared by the Downtown Strategic Plan Advisory Committee 1993 June 10 |
9 | 18 | ||
|
Fact Book Downtown Los Angeles prepared by the Downtown Strategic Plan Advisory Committee 1991 |
9 | 19 | ||
|
Report of the Citizens Advisory Committee on the Los Angeles City Central Business District Redevelopment Plan prepared by the Citizens Advisory Committee 1976 July |
9 | 20 | ||
|
Earthquake Hazard Reduction: Cumulative Impact on Historic Buildings: A Critical Issues Study Final Report coordinated by the Community Redevelopment Agnecy of the City of Los Angeles and the Los Angeles Conservancy 1986 Scope and Contents noteAnother copy at item #180, carton 5 |
9 | 21 | ||
|
LA Alive- Again Community Redevelopment Agency/ City of Los Angeles 1983 December Scope and Contents noteReprint of article from Muse Air Monthly Magazine. |
9 | 22 | ||
|
Downtown Public Art written by Christopher Knight 1983 August 28-31 Scope and Contents noteReprint from Herald Examiner. |
9 | 23 | ||
|
Downtown Los Angeles Office Building Map by Jones Lang Wootton 1983 |
9 | 24 | ||
|
Public Art in Downtown Los Angeles prepared by the Community Redevelopment Agency of Los Angeles 1986 Scope and Contents noteArt guidebook. |
9 | 25 | ||
|
Technical Report: Shrubs and Trees for Landscaping and Screening prepared by the Department of City Planning Los Angeles 1968 |
9 | 26 | ||
|
Metro Rail Station Area Master Plan, Central Business District: Draft prepared by the Community Redevelopment Agency City of Los Angeles 1985 Scope and Contents notePlans for proposed developments and integration with proposed Metro Rail Stations in the CBD. |
9 | 27-28 | ||
|
Downtown Los Angeles from the Los Angeles Times reprinted by the Community Redevelopment Agency of Los Angeles 1982 |
10 | 1 | ||
|
Los Angeles Central City Community Plan (A part of the General Plan of Los Angeles) prepared by the Department of City Planning 1983 June 10 |
10 | 2 | ||
|
Los Angeles Central City Proposed Plan prepared by the Department of City Planning Los Angeles 1972 June |
10 | 3 | ||
|
Determination of Eligibility Report Los Angeles Central Business District prepared for the Community Redevelopment Agency of the City of Los Angeles by Roger G. Hatheway and Associates 1983 June |
10 | 4-5 | ||
|
Central Business District Redevelopment Project- Stipulated Judgement court case number C133468 1977 November 22 Scope and Contents noteState of Calif Superior Court Case #C1334678, dismissing protests to CBD Redevelopment project. |
10 | 6 | ||
|
The Power of Place, Los Angeles by Dolores Hayden, Gail Dubrow, and Carolyn Flynn undated Scope and Contents notehistorical pamphlet |
10 | 7 | ||
|
Guide to Downtown Los Angeles by AAA of Southern California 1973 July |
10 | 8 | ||
|
Seven Compelling Reasons for the CBD Redevelopment Plan by the Office of the Mayor, Los Angeles 1975 |
10 | 9 | ||
|
Los Angeles CBD Employee Travel Baseline Survey: Final Report by Barton-Ashmann Associates and Recht Hausrath & Associates 1987 April |
10 | 10-11 | ||
|
Transfer of Development Rights - Ordinance #163617 1988 June 21 |
10 | 12 | ||
|
Downtown Los Angeles: The Dynamics of the Real Estate Market by Price Waterhouse 1992 |
10 | 13 | ||
|
Business profile of Downtown: New Bench Mark Data Documenting the Economic Importance of the Downtown Area by Western Economic Research Co 1989 |
10 | 14 | ||
|
1993 Los Angeles Basin Real Estate by Grubb & Ellis 1993 |
10 | 15 | ||
|
Building Owners and Managers Association (BOMA) of Greater Los Angeles 1993 Scope and Contents notepacket of information |
10 | 16 | ||
|
Requirements for Office/Commercial Projects Located within the CBD Redevelopment Project 1988 August |
10 | 17 | ||
|
Report on the Refinements of SCAG's Regional Growth Forecasts for the Los Angeles CBD by Cordoba Corp and Michael Popwell Assoc 1990 June 4 |
10 | 18 | ||
|
Civic Center Development Plan: An Element of the General Plan of the City of Los Angeles by LA City Planning Dept 1969 March 12 |
10 | 19 | ||
|
CBD Transfer of Floor Area Ratio Implementation Policy - Public Benefit Program Payment Guidelines the Community Redevelopment Agency 1991 September 5 |
10 | 20 | ||
|
State Historic Building Code 1979 August |
10 | 21 | ||
|
Secretary of the Interior: Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings 1979 January |
10 | 22 | ||
|
Los Angeles and the Palm Tree: Image of a City by the Los Angeles Olympic Organizing Committee 1984 Scope and Contents noteArt catalogue. |
10 | 23 | ||
|
The Sixty-Mile Circle: The Economy of the Greater Los Angeles Area by the Security Pacific Corp 1984 February |
10 | 24 | ||
|
LA 2000: A City for the Future by the Los Angeles 2000 Committee 1988 November Scope and Contents noteFinal report. |
10 | 25 | ||
|
Recommendations to Strengthen Retail Activity in Downtown Los Angeles by ULI 1978 June 19-23 Scope and Contents notepanel service report |
10 | 26 | ||
|
A Greater Downtown for the 21st Century by LA City Planning Dept 1990 July |
10 | 27 | ||
|
Los Angeles Centopolis 1980: General Development Plan by the Central City Committee and LA City Planning Dept 1962 January |
10 | 28 | ||
|
Concepts for Los Angeles by the LA City Planning Dept 1967 September |
10 | 29 | ||
|
GOALS: Planning Goals for the Los Angeles Metropolis - discussion paper by the City and Regional Planning Commissions 1967 June |
10 | 30 | ||
|
Concept Los Angeles: the Concept of the Los Angeles General Plan by LA City Planning Dept 1970 January |
10 | 31 | ||
|
Downtown Art in Public Places Policy by the Community Redevelopemtn Agency 1985 August 26 Scope and Contents noteAnother copy in carton 12, #332 |
10 | 32 | ||
|
Skyline - Signage Policy draft by the Community Redevelopment Agency 1986 January |
10 | 33 | ||
|
Downtown Los Angeles map by the Community Redevelopment Agency 1984 |
10 | 34 | ||
|
Los Angeles Central City Community Plan, a part of the General Plan by the City of LA 1989 April Scope and Contents note3-ring binder |
10 | 35 | ||
|
Central Business District Core Area Development Framework by the Community Redevelopment Agency 1985 Scope and Contents notedraft, 3-ring binder" |
10 | 36 | ||
|
Regional and Community Shopping Centers Map of Los Angeles and Orange Counties by Coldwell Banker 1977 Scope and Contents notemap, land use inventory map" |
10 | 37 | ||
|
Community Redevelopment Agency Programs and Projects 1983-1984 |
10 | 38 | ||
|
Redevelopment/Revitalization Projects by the Community Redevelopment Agency undated Scope and Contents noteProject areas pamphlet |
10 | 39 | ||
|
Central City Los Angeles 1972/1990 Preliminary Plan by the Committee for Central City Planning and Wallace, McHarg, Roberts and Todd, consultants 1972 April Scope and Contents noteBrochure describing the plan. |
10 | 40 | ||
|
Central Business District Redevelopment Project by the Community Redevelopment Agency 1991 Scope and Contents noteStatus report, brochure. |
10 | 41 | ||
|
The Community Redevelopment Agency Los Angeles 1987 Scope and Contents notePacket of info about CRA, with map, fact sheets, brochure, and a newsletter. |
10 | 42 | ||
|
Workshop on the Development Marketplace for Downtown Los Angeles by the Community Redevelopment Agency 1980 October 9 Scope and Contents noteWorkshop held at Hyatt Regency, transcript of discussion. |
10 | 43 | ||
|
Tax Allocation Bonds for CBD Redevelopment Project, Series A, $16,000,000 by the Community Redevelopment Agency 1980 June 4 |
10 | 44 | ||
|
Tax Allocation Bonds for CBD Redevelopment Project, Series B, $30,000,000 1981 July 15 |
10 | 45 | ||
|
Amendment: Tax Allocation Bonds for CBD Redevelopment Project, Series B, $30,000,000 by the Community Redevelopment Agency 1981 November 18 |
10 | 46 | ||
|
Tax Allocation Bonds for CBD Redevelopment Project, Series E, $48,000,000 by the Community Redevelopment Agency 1985 June 24 |
10 | 47 | ||
|
Tax Allocation Bonds for CBD Redevelopment Project, Series G, $190,170,000 by the Community Redevelopment Agency 1987 January 28 |
10 | 48 | ||
|
Tax Allocation Bonds for CBD Redevelopment Project, Series H, $15,960,000 by the Community Redevelopment Agency 1987 February 25 |
10 | 49 | ||
|
California Community Redevelopment Law and Statutes Referenced Therein prepared by Kane, Ballmer & Berkman 1990 January 1 Scope and Contents noteIncludes changes from statutes enacted in 1989. |
11 | 1 | ||
|
Design for Development: Bunker Hill by I.M. Pei & Associates, Barton-Aschman, Roy Wenzlick 1964 January |
11 | 2 | ||
|
Transportation Aspects of the Bunker Hill Urban Renewal project by Barton-Aschman for I.M. Pei & Associates 1964 January |
11 | 3 | ||
|
The Central City Employee: A Survey of Shopping Habits by LA Times Marketing Research 1975 October |
11 | 4 | ||
|
Bunker Hill Redevelopment Research Summary by Wurster, Bernardi and Emmons Inc. and Lawrence Halperin Assoc 1969 June 24 |
11 | 5 | ||
|
Metropolitan Area Trends - Upper Bunker Hill Urban Design Study by Development Research Associates 1969 July 7 |
11 | 6 | ||
|
Annual Report by the Community Redevelopment Agency 1969 |
11 | 7 | ||
|
Hotel-Motel Market Demand Analysis, Bunker Hill Redevelopment Project by the Development Research Associates 1969 |
11 | 8 | ||
|
Guide for Developers - First Phase, Land Disposition, Parcel B-1 by the Community Redevelopment Agency 1963 April Scope and Contents noteLand disposition report, 15 pages. |
11 | 9 | ||
|
Preliminary Geologic Investigation Bunker Hill by Donald R. Warren, Eng. for Daniel, Mann, Johnson & Mendenhall 1962 May Scope and Contents noteThe BH Redevelopment Area is located on the south limb of the Los Angeles anticline. |
11 | 10 | ||
|
Market Analysis - Upper Bunker Hill by the Development Research Associates 1969 October 28 |
11 | 11 | ||
|
A Parking Standards Report - Volume I by the Parking Standards Design Associates 1971 February 15 Scope and Contents noteStudy justifying recommended changes in the city parking standards due to shift to compact cars. |
11 | 12 | ||
|
A High Profile for Bunker Hill - Demand for High-Rise Office Space Turns Downtown to Boomtown by Joseph Giovannini 1982 March 7 Scope and Contents noteIn California Living, LA Herald Examiner. |
11 | 13 | ||
|
LA City Ordinance 147480: Approving and Adopting the Development Plan for the CBD Redevelopment Project 1975 July 18 |
11 | 14 | ||
|
Court case: Brnani Bernardi et al vs. City Council of LA (case no. C133468 about CBD redevelopment) 1977 November 22 |
11 | 15 | ||
|
Owner-Participation Agreement between CRA and Pacific Mutual Life Insurance Co. 1959 June 29 |
11 | 16 | ||
|
Amended Financing Plan for Bunker Hill Redevelopment Project (loan application to HUD) 1970 July 21 General noteLegal document. |
11 | 17 | ||
|
Loan and Capital Grant Contract between CRA and US govt [HUD] (Calif. R-1) 1959 November 25 Scope and Contents noteLegal document. |
11 | 18 | ||
|
Supplemental Agreement between City of LA and CRA 1960 May 20 General noteLegal document about Bunker Hill Urban Renewal Project 1-B (Calif. R-1). |
11 | 19 | ||
|
Assistance Agreement re: Bunker Hill Urban Renewal Project 1-B 1960 April 8 General noteLegal document. |
11 | 20 | ||
|
Tract map No. 30780 1979 Scope and Contents noteSurvey of 4th to General Thaddeus Kosciuszko Way, Hope to Olive Streets, showing easements, slope, tunnel structure. |
11 | 21 | ||
|
Los Angeles Redevelopment: How It Got Where It Is by the Community Redevelopment Agency undated Scope and Contents note48-pg history of CRA and redevelopment in LA, some discussion of blight. |
11 | 22 | ||
|
Formation of the Community Redevelopement Agency 1948 Scope and Contents noteCopies of various documents of CRA incorporation, minutes of early meetings. |
11 | 23 | ||
|
LA City Ordinance 113231: formation of Bunker Hill Urban Renewal Project 1-B 1959 March 31 General noteNewspaper public notice. |
11 | 24 | ||
|
LA City Ordinance 108424: approval of tentative plan for Central Redevelopment Plan No. 1 and establishing area as Bunker Hill Urban Renewal Project No. 1-B 1956 November 14 General noteNewspaper public notice. |
11 | 25 | ||
|
Agreement Containing Covenants Affecting Real Property 1965 May 9 General noteLegal document. |
11 | 26 | ||
|
Bunker Hill by John Chapman 1968 November 3 Scope and Contents noteLA Times West Magazine, pp 18-20, 23-24, 26" |
11 | 27 | ||
|
LA 200! A Special Issue Celebrating Our Bicentennial from the LA Herald Examiner 1980 August 31 |
11 | 28 | ||
|
Bunker Hill First Phase Land Disposition, Parcel B-1 by the Community Redevelopment Agency 1963 May General noteThese items have been removed from their leather packet for preservation purposes. The leather packet has been put on the shelf with the collection. Scope and Contents noteLeather packet for offering for sale of first parcel of land - 36 items included (originally, not all are in packet). |
11 | 29-31 | ||
|
Local Grant-in Aid and Cooperation Agreement between LA and Community Redevelopment Agency 1968 January 22 General noteLegal document. |
11 | 32 | ||
|
Declaration of Restrictions (Attachment No. 11) 1965 May 20 General noteLegal document. |
11 | 33 | ||
|
California Community Redevelopment Law (as amended through 1961 regular legislative session) 1961 General noteLegal document. |
11 | 34 | ||
|
Los Angeles Public Library re-opening brochure 1993 October |
11 | 35 | ||
|
Center-City Living - The Loft Approach: Las Grand Market 1982 July 18 Scope and Contents noteSeveral articles in LA Times Home section. |
11 | 36 | ||
|
Engineers at Work Figuring on Razing: Contract Requires Exact Estimates as to Bunker Hill 1912 November 10 Scope and Contents noteLA Sunday Times, photocopy and transcription of article about re-grading Bunker Hill. |
11 | 37 | ||
|
Market Analysis - Redevelopment Parcel B-1 by Roy Wenzlick and Co. for the Community Redevelopment Agency 1962 November 15 Scope and Contents noteConcluded that favorable residential market exists. |
12 | 1 | ||
|
You and the Bunker Hill Redevelopment Project by the Community Redevelopment Agency 1961 Scope and Contents note10 pp booklet to explain redevelopment and process. |
12 | 2 | ||
|
LA Renaissance by Milton Stark 1961 September - October Scope and Contents noteReprint from California Highways and Public Works. |
12 | 3 | ||
|
El Pueblo Grande: A Non-Fiction Book about Los Angeles by John D. Weaver 1973 Scope and Contents noteWard Ritchie Press |
12 | 4 | ||
|
Funicular Railways: From Angels Flight to Shasta Springs by Joseph Campbell 1993 Scope and Contents noteBorden Publishing |
12 | 5 | ||
|
Angels Flight by Walt Wheelock 1993 Scope and Contents noteBorden Publishing Co |
12 | 6 | ||
|
The Battle of Bunker Hill by Bromley and Company 1971-1975 Scope and ContentIncluded in this file are the book The Battle of Bunker Hill by Bromley and Co, and a Parchment of the Historical Documents Co. about the Battle of Bunker Hill (1971). |
12 | 7 | ||
|
Pacific Electric Railway: A Pictorial Album of Electric Railroading by Donald Duke 1958 Scope and Contents notePacific Railway Journal, San Marino. |
12 | 8 | ||
|
Design for Development - Bunker Hill by the Community Redevelopment Agency 1968 May 1 |
12 | 9 | ||
|
Design for Development - Bunker Hill by the Community Redevelopment Agency 1971 January 6 |
12 | 10 | ||
|
Bunker Hill Redevelopment Project Biennial Report 1986-1988 by the Community Redevelopment Agency 1988 November |
12 | 11 | ||
|
Los Angeles Metropolitan Area Today by ULI 1987 Scope and Contents noteULI Fall meeting, descriptions of all major bldgs, downtown and region" |
12 | 12 | ||
|
Bunker Hill Urban Renewal Project Biennial Report by the Community Redevelopment Agency 1986 October |
12 | 13 | ||
|
Bunker Hill Subordinate Tax Allocation Bonds, Series A, $100,000,000 by the Community Redevelopment Agency 1985 October 17 |
12 | 14 | ||
|
Downtown Art in Public Places Policy by the Community Redevelopment Agency 1985 August 26 Scope and Contents noteAnother copy at carton 10, item #282. |
12 | 15 | ||
|
Proposed North-South One-Way Street System for the CBD by the LA Department of Transportation 1985 September 25 |
12 | 16 | ||
|
Bunker Hill Fact Book by the Community Redevelopment Agency 1984 Scope and Contents note[book marked 1983] |
12 | 17 | ||
|
Programs and Projects of the by the Community Redevelopment Agency 1983-1984 Scope and Contents noteProgress reports. |
12 | 18 | ||
|
Develop Offering - Remaining 8.75 acres of Bunker Hill, Downtown Los Angeles by the Community Redevelopment Agency- Parcel R, S, T, U, Y-1 1979 |
12 | 19 | ||
|
Bunker Hill Project Tax Allocation Bonds, Series C, $18,250,000 by the Community Redevelopment Agency 1980 April 23 |
12 | 20 | ||
|
Progress Report 1976-1980 by the Community Redevelopment Agency 1980 |
12 | 21 | ||
|
Angels Flight by Walt Wheelock 1978 Scope and Contents notePhotocopy of original edition. |
12 | 22 | ||
|
Bunker Hill - The Impact of a Redevelopment Project on Downtown Los Angeles by Richard K. Meyer 1978 June Scope and Contents noteStanford University Senior Honors Project. |
12 | 23 | ||
|
Overview of Federally Assisted Projects in Downtown Los Angeles: Implemented Projects and Future Opportunities by the Community Redevelopment Agency 1977 December |
12 | 24 | ||
|
Report to Mayor Yorty regarding conclusion of Bunker Hill Redevelopment litigation by Roger Arneberg (city attorney) 1964 March |
12 | 25 | ||
|
Judgement of California Superior Court in re Bunker Hill litigation 1964 February Scope and Contents noteRuling in favor of Community Redevelopement Agency |
12 | 26 | ||
|
Los Angeles Headquarters City - Dynamic Center of the New West by LA DWP circa 1960 |
12 | 27 | ||
|
Community Redevelopment Agency Combined Annual Report - Fiscal 1967-1968 by the Community Redevelopment Agency 1968 |
12 | 28 | ||
|
Community Redevelopment Agency Annual Report 1965/1966 1966 |
12 | 29 | ||
|
Bunker Hill Urban Renewal Project - Tentative Plan by the Community Redevelopment Agency 1956 June |
12 | 30 | ||
|
Bunker Hill Project - Owner Participation Agreements (memo to agency members) by the Community Redevelopment Agency 1959 July 16 Scope and Contents noteLists owner participants of 10 parcels with summary text of agreements. |
12 | 31 | ||
|
Cultural Heritage Board Report circa 1962 Scope and Contents noteText and pictures of 27 monuments |
12 | 32 | ||
|
Community Redevelopment into Assets by the Community Redevelopment Agency 1949 June |
12 | 33 | ||
|
Tax Increments - Bunker Hill (memo from LA County auditor) by the Community Redevelopment Agency 1963 July 26 |
12 | 34 | ||
|
The Economic Phases of the Bunker Hill Renewal Project and Report Supplement by Henry A. Babcock, consulting engineers, for the Community Redevelopment Agency 1956 May 15 |
12 | 35-36 | ||
|
Final Environmental Impact Report for the Bunker Hill Urban Renewal Project by the Community Redevelopment Agency 1973 December 12 |
12 | 37 | ||
|
Legal Response to Superior Court Preliminary Injunction Request by State Senator Alan Robbins to stop Agency payment for a pedestrian bridge 1975 July Scope and Contents notePreliminary injunction denied. |
12 | 38 | ||
|
Bunker Hill Urban Renewal Project by the Wurster, Bernardi & Emmons and Lawrence Halprin & Assoc. 1971 March Scope and Contents noteUrban design study. |
12 | 39 | ||
|
Feasibility Study of High-Rise Project for the Elderly on Bunker Hill by Walker and Lee- Parcel X and Y 1975 Scope and Contents note[no title page] |
12 | 40 | ||
|
Bunker Hill Urban Design Services Memorandum Report 1 by Charles Kober Associates 1975 July Scope and Contents noteJon Jerde proposals to activate the project |
12 | 41 | ||
|
Los Angeles Central City Community Plan (a part of the General Plan of the City of Los Angeles) by LA Dept of City Planning 1983 June |
12 | 42 | ||
|
Infrastructure Decision Making: New Direction in Public Facility Financing in California by California Planning Roundtable, American Planning Association 1983 February Scope and Contents noteCalifornia Plaza article |
12 | 43 | ||
|
LA Alive - Again by David Reed and Jane Lasky 1983 December Scope and Contents noteReprint from Muse Air Monthly |
12 | 44 | ||
|
Partnerships - New Models for Urban Development by Urban Design International 1982 Fall Scope and Contents noteSpecial issue of this journal, BH Redevelopment article by Edward Helfeld, vol 4 no 1. |
12 | 45 | ||
|
Downtown Development Study by the Central City Association 1981 Scope and Contents noteCurrent and planned downtown development data. |
12 | 46 | ||
|
A Greater Downtown for the 21st Century by LA Dept of City Planning 1990 July |
12 | 47 | ||
|
Bunker Hill Redevelopment Project Biennial Report by the Community Redevelopment Agency 1993 |
12 | 48 | ||
|
Bunker's Comeback by Cynthia Joyce 1968 May Scope and Contents noteReprint from Los Angeles Magazine, pp 38-40. |
12 | 49 | ||
|
The Architects: A Chance for Greatness by Walter McQuade circa 1970 Scope and Contents noteReprint from Fortune magazine. |
12 | 50 | ||
|
Sprawling Los Angeles Gets a New Skyline in Business Week 1969 December 13 |
12 | 51 | ||
|
WBE: Wurster, Bernardi and Emmons presentation brochure 1970 |
12 | 52 | ||
|
Citizen Guide to Redevelopment by California Redevelopment Association circa 1988 Scope and Contents note1 original booklet and one copy. |
12 | 53 | ||
|
Los Angeles Central City Community Plan: Part of the General Plan of LA by the LA Dept of City Planning 1989 October 13 |
12 | 54 | ||
|
Los Angeles 30: Three Decades that Changed LA by Kathleen Neumeyer and Rubin Carson 1990 Scope and Contents note2 articles copied from Los Angeles Magazine, 1) 30 People, 2) 30 Things that have changed LA. |
12 | 55 | ||
|
Jon Jerde: Redesigning the City 1986 May Scope and Contents noteArt catalogue. |
12 | 56 | ||
|
Los Angeles Bicentennial: A Legacy for the Future by the Los Angeles 200 Committee 1985 July |
12 | 57 | ||
|
Development Opportunities in Los Angeles by the Community Redevelopment Agency 1978 June Scope and Contents note2 packets/not complete |
13 | 1 | ||
|
Bunker Hill Completion Program 1977-1986: Draft by the Community Redevelopment Agency 1977 March |
13 | 2 | ||
|
Market Analysis of Bunker Hill Urban Renewal Project by the Taylor Dark and Val Higginbotham 1977 |
13 | 3 | ||
|
Concept Los Angeles: The Concept of the Los Angeles General Plan by the LA City Planning Commission 1974 April |
13 | 4 | ||
|
Bunker Hill Pedestrian Connection Schematics by Wurster, Bernardi & Emmons 1976 |
13 | 5 | ||
|
Angel's Flight: Technical Report by R. Duell and Associates 1978 October |
13 | 6 | ||
|
Bunker Hill Redevelopment Plan by the Community Redevelopment Agency 1970 June |
13 | 7 | ||
|
Programs for Transportation and Parking: Bunker Hill Urban Renewal Project by Barton-Aschman Associates 1970 May Scope and Contents noteKey document |
13 | 8 | ||
|
High-Rise Apartment Buildings by Yukio Kawaratani 1963 November Scope and Contents noteUCLA term paper in eng. Class - contains also Oct 1961 Urban Land article ""High-Rent Apts in the Suburbs"" and 1/17/63 CRA memorandum about elementary-age school children from high-rise bldgs" |
13 | 9 | ||
|
Bunker Hill Redevelopment: Implementing a Dynamic Plan for Downtown Los Angeles by the Community Redevelopment Agency undated Scope and Contents note2-pg brochure |
13 | 10 | ||
|
Cushman & Wakefield in Downtown Los Angeles 1979 |
13 | 11 | ||
|
Board Briefs: Public Invited to Attend Meeting on Bunker Hill by the Community Redevelopment Agency- Parcel R, S, T, U, Y-1 1980 March 24 Scope and Contents noteOne original and one copy. |
13 | 12 | ||
|
The Story of Ann: A Leading Lady in Urban Redevelopment 1961 June 29 Scope and Contents noteDraft, Ann St redevelopment, CRA redev. project, began in 1955. |
13 | 13 | ||
|
California Plaza by Bunker Hill Associates 1983 October 3 Scope and Contents notePress kit, various materials relating to the development. |
13 | 14 | ||
|
California Plaza by Bunker Hill Associates 1982 July 1 Scope and Contents noteSpiral bound book of plans for pedestrian circulation, parking, phasing, etc. |
13 | 15 | ||
|
CRA: Present and Past Agency Board Members undated Scope and Contents noteappt dates, 11/48-2/96 |
13 | 16 | ||
|
Brief History of the CRA of LA Operations 1948-1965 1965 |
13 | 17 | ||
|
Bunker Hill Contracts - Chronological Index 1950-1964 by the Community Redevelopment Agency 1964 |
13 | 18 | ||
|
Project Index by the Community Redevelopment Agency circa 1963 |
13 | 19 | ||
|
Annual Report: fiscal 1964-1965 by the Community Redevelopment Agency 1965 September 30 |
13 | 20 | ||
|
Redevelopment Plan for the Bunker Hill Urban Renewal Project 1B, a Part of Central Redevelopment Area 1 by the Community Redevelopment Agency 1958 |
13 | 21 | ||
|
Rebuttal Statement on Relocation (of Bunker Hill residents) by the Community Redevelopment Agency 1958 November 14 Scope and Contents noteKey document. |
13 | 22 | ||
|
Final Argument on Bunker Hill Redevelopment Plan by the Community Redevelopment Agency 1959 January 7 |
13 | 23 | ||
|
Bunker Hill Urban Renewal Project - offering of multiple parcels by the Community Redevelopment Agency- Parcel A, B, C, G, I 1968 Scope and Contents noteIncludes maps, site descriptions. |
13 | 24 | ||
|
Amended Redevelopment Plan - Bunker Hill Urban Renewal Project 1B by the Community Redevelopment Agency 1968 |
13 | 25 | ||
|
100 Years (And More) of Bunker Hill History by Bergen and Lee, public relations, for City Reconstruction Corp 1967 |
13 | 26 | ||
|
Amended Design for Development by the LA Dept of City Planning 1970-1971 Scope and Contents notecase #3595 |
13 | 27 | ||
|
Bunker Hill Project, Tax Allocation Bonds, Series B, $10,000,000 by the Community Redevelopment Agency 1971 October 20 |
13 | 28 | ||
|
Citywide Plan: A Portion of the General Plan of LA by LA Dept of City Planning 1974 |
13 | 29 | ||
|
Los Angeles Central City Proposed Plan by LA Dept of City Planning 1972 June |
13 | 30 | ||
|
Downtown Los Angeles 1982 by Austin Scott and others 1982 April 25-28 Scope and Contents noteReprint from LA Times. |
13 | 31 | ||
|
Community Redevelopment Agency promotional folder 1982 December Scope and Contents noteVarious materials/info on the Community Redevelopment Agency |
13 | 32 | ||
|
Downtown Public Art by Christopher Knight 1983 August 28-31 Scope and Contents noteReprint from LA Herald Examiner. |
13 | 33 | ||
|
Los Angeles: Renewed Leasing Downtown by Karen St. George 1983 December Scope and Contents noteReprint from National Real Estate Investor. |
13 | 34 | ||
|
LA City Council Approves Huge California Plaza Project for Bunker Hill; Work to Start next Fall by Bunker Hill Associates 1982 January 19 Scope and Contents notePress release |
13 | 35 | ||
|
Downtown Los Angeles by Ronald McNees 1990 April 15 Scope and Contents noteReprint from Southern California Real Estate Journal. |
13 | 36 | ||
|
Celebrate the "New" Central Library - Opening Festival 1993 October 3 Scope and Contents noteBrochure |
13 | 37 | ||
|
Central Library Returns 1994 February Scope and Contents noteIn Vision magazine (of LAPL?) Vol 2 no 1. |
13 | 38 | ||
|
Five-Year Implementation Plan of Bunker Hill Urban Renewal Project by the Community Redevelopment Agency 1994 October 20 Scope and ContentThis Five-Year Implementation Plan was adopted 1994 October 20. |
13 | 39 | ||
|
Lost Streets of Bunker Hill by Anastasia Loukaitou-Sideris and Gail Sansbury 1995 Scope and Contents noteReprint from California History, Winter 1995/96, vol LXXIV no 4, pp 394-407, 448-449. |
13 | 40 | ||
|
Bunker Hill Urban Renewal Project: Background Materials by the Community Redevelopment Agency 1994 Scope and Contents note1) Redevelopment Plan 25 June 1970, 2) Design for Development 6 Jan 1971, 3) Downtown Strategic Plan, Bunker Hill Excerpts Aug 1994. |
13 | 41 | ||
|
Bunker Hill: Urban Center of the West circa 1972 Scope and Contents notebrochure |
13 | 42 | ||
|
Central City Association Annual Report and Information by Central City Association 1983 Scope and Contents notefolder of materials |
13 | 43 | ||
|
Urban Transportation in Transition 1972 April Scope and Contents noteSpecial issue of Nation's Cities (vol 10 no 4), magazine of national League of Cities. |
13 | 44 | ||
|
Parking Issues Affecting the Bunker Hill Redevelopment Program by Barton-Aschman Associates for CRA 1969 July |
13 | 45 | ||
|
Improving Public Transportation in Los Angeles by Citizens Advisory Council on Public Transportation 1967 July Scope and Contents noteConclusion: Major improvement needed to supplement autos, should proceed with a known solution and should build a new rapid transit system. |
13 | 46 | ||
|
Transit Expressway Report by MPC Corporation 1967 February Scope and Contents noteTesting and evaluation of the Transit Expressway demonstration project. |
13 | 47 | ||
|
Westinghouse Transit Expressway by Westinghouse Electric Corp 1966 April Scope and Contents noteSouth Park Allegheny County PA, early people mover prototype. |
13 | 48 | ||
|
Transportation Aspects of the Bunker Hill Urban Renewal Project by Barton-Aschman Assoc for I. M. Pei 1964 January Scope and Contents noteStreet system plan prepared as part of I. M. Pei planning and design contract for Bunker Hill. It later became the street system adopted with the Amended Redevelopment Plan in 1968 and constructed with relatively few modifications. |
13 | 49 | ||
|
Two Angels on a String: The Story of Angel's Flight by Donald Duke 1958 February Scope and Contents noteCopy from Pacific Railway Journal (vol 2 no 5). |
13 | 50 | ||
|
The Case for the Development of a Grade Intersection at Fourth and Hope Streets by Daniel, Mann, Johnson & Mendenhall 1962 June 25 |
13 | 51 | ||
|
Los Angeles Central Business District Transportation Study by Schimpeler-Corradino Assoc, LA Dept of Transportation 1983 December Scope and Contents noteTransportation programs to replace the capacity that was lost with the Downtown People Mover Project. |
13 | 52 | ||
|
Real Estate Development Potential in the Metro Rail Corridor by Economic Research Associates for CRA 1984 March Scope and Contents noteTo estimate increased real estate value of metro Rail to redevelopment areas. |
13 | 53 | ||
|
Economic Analysis of Metro Rail Benefit Assessment in Downtown Los Angeles by the Community Redevelopment agency 1985 February |
13 | 54 | ||
|
Real Estate Development Potential in the Metro Rail Corridor by CRA/Economic Research Associates 1984 October |
13 | 55 | ||
|
Metro Rail Joint Development Central Business District by the Community Redevelopment Agency 1984 January Scope and Contents noteContext and development objectives. |
13 | 56 | ||
|
Metro Rail Overview by the Community Redevelopment Agency 1984 January Scope and Contents noteMetro Rail from CRA downtown perspective. |
13 | 57 | ||
|
Traffic Impact Analysis for Bunker Hill Parcels K, Q, and W - Draft Report by Barton-Aschman Associates for the Community Redevelopment Agency 1985 October |
13 | 58 | ||
|
Dallas Walkways: A Report on a Sheltered Pedestrian System in the Business Center by Vincent Ponte (planner) for City of Dallas 1979 October |
13 | 59 | ||
|
Los Angeles Downtown People Mover - Executive Summary by the Community Redevelopment Agency 1980 April |
14 | 1 | ||
|
7th Street DPM Retail Concourse by the Community Redevelopment Agency 1979 August Scope and Contents noteApplication for Federal Assistance from the UMTA Section 3 Urban Initiatives Joint Development Program |
14 | 2 | ||
|
Application for Federal Assistance: Final Design and Implementation Phase, Los Angeles Downtown People Mover by the Community Redevelopment Agency 1979 March |
14 | 3 | ||
|
Parking Management Plan Proposals by the Parking Management Steering Committee 1977 October Scope and Contents note""Recommendations to encourage voluntary reduction of parking supply and encourages use of car-pooling and transit""" |
14 | 4 | ||
|
Draft Environmental Impact Report - Los Angeles Downtown People Mover Program by the Community Redevelopment Agency 1978 September |
14 | 5-6 | ||
|
Rapid Transit Stations in the LA CBD, Urban Design and Joint Development Studies by Wallace McHarg Roberts and Todd for So Cal RTD 1978 May |
14 | 7 | ||
|
Angel's Flight by R. Duell and Associates for the Community Redevelopment Agency 1978 October Scope and Contents note19 pp, technical report and basic preliminary information" |
14 | 8 | ||
|
Bunker Hill People Mover Program - Letter to Mayor Tom Bradley by the Community Redevelopment Agency 1974 April 26 Scope and Contents noteCommunity Redevelopment Agency response to series of questions and concerns raised by mayor's staff. |
14 | 9 | ||
|
Bunker Hill People Mover - Progress Report by the Community Redevelopment Agency 1973 December |
14 | 10 | ||
|
Bunker Hill People Mover - West Leg Route Selection by the Community Redevelopment Agency 1973 November 30 Scope and Contents noteRecommends elevated Second Street route over Pacific Electric tunnel route on the basis of cost and service. |
14 | 11 | ||
|
Bunker Hill People Mover and Peripheral Parking System - Traffic Feasibility Study by VTN Consolidated Inc for Community Redevelopment Agency 1973 November Scope and Contents note""Concludes that both the Eastside and Westside satellite parking facilities are feasible""" |
14 | 12 | ||
|
Bunker Hill People Mover presentation by VTN Corp and Westinghouse Electric Corp 1973 July 31 Scope and Contents note""Proposal to put together a planning concept, business plan, and implementation plan for CRA""" |
14 | 13 | ||
|
Downtown Distribution Plan - San Bernardino Express Busway by Wilber Smith and Assoc 1973 March 9 |
14 | 14 | ||
|
Traffic Feasibility Study of the Proposed West and East Peripheral Parking Terminals - Draft by VTN Engineers 1972 August 31 |
14 | 15 | ||
|
Peripheral Parking Program - Patronage and Revenues - Central City Los Angeles by Wilber Smith and Associates 1973 April |
14 | 16 | ||
|
A Peripheral Parking Program - Central City LA - 1972-1980 - Draft Report by Wilber Smith and Associates 1972 March |
14 | 17 | ||
|
The People Mover and Peripheral Parking System by John Kincel (Community Redevelopment Agency) 1972 Scope and Contents notebinder, ""early studies notebook of charts, diagrams, maps""" |
14 | 18-19 | ||
|
The People Mover - Auxiliary Transit and Satellite Parking System by John Kincel (Community Redevelopment Agency) 1972 Scope and Contents notecopy of portion of item #450 |
14 | 20 | ||
|
Proposed Central City Elevated Pedway Plan - Staff Report by LA Dept of City Planning 1971 September |
14 | 21 | ||
|
Kaiser Engineers 1971 February Scope and Contents noteconsultant brochure |
14 | 22 | ||
|
Pacific Electric Tunnel: A Feasibility Study to Develop the Concept of Satellite Parking for the Downtown Area by LA Bureau of Engineering 1971 January |
14 | 23 | ||
|
Review of Access Plans for Parcels I, F, and C by Barton-Aschman Assoc for the Community Redevelopment Agency 1971 May |
14 | 24 | ||
|
Bunker Hill Pedestrian Transport System Alignments and Space Requirements by Barton-Aschman Assoc for the Community Redevelopment Agency 1970 December Scope and Contents note""Alignment of Downtown Auxiliary Rapid Transit (DART) and easement space requirements of Bunker Hill Transportation vehicles""" |
14 | 25 | ||
|
Proposed Parking Program - Bunker Hill by Barton-Aschman Assoc for the Community Redevelopment Agency 1970 April |
14 | 26 | ||
|
Square Foot Cost Averaging Principle for Parking Structures by Richard F. Roti 1970 November Scope and Contents note""costs of self-park parking structures"", publ by National Parking Assoc" |
14 | 27 | ||
|
Downtown Auxiliary Rapid Transit by Transportation Committee of General Plan Advisory Board 1970 April |
14 | 28 | ||
|
Programs for Transportation and Parking - Bunker Hill Urban Renewal Project by Barton-Aschman Assoc for the Community Redevelopment Agency 1970 May Scope and Contents note""with Wurster, Bernardi and Emmons design study became the revised transportation plan for Bunker Hill featuring satellite parking and a people mover system""" |
14 | 29 | ||
|
Proposed People Mover System Developed in Conjunction with Bunker Hill Satellite parking Program by Barton-Aschman Assoc for the Community Redevelopment Agency 1970 April |
14 | 30 | ||
|
The Needs and Specifications of a Special Pedestrian Transport System for Bunker Hill by Barton-Aschman Assoc for the Community Redevelopment Agency 1969 September |
14 | 31 | ||
|
Final Environmental Impact Statement - Downtown People Mover Project by UMTA, US Dept of Transportation 1980 June Scope and Contents noteChapter 4 - Description of proposed action (describes DPM system characteristics |
14 | 32 | ||
|
System Specification - Volume 1 - Downtown People Mover Project by the City of LA 1980 April |
14 | 33 | ||
|
Rideshare - A Guide for Downtown Los Angeles by Central City Assoc of LA, BOMA of LA, Commuter Transportation Services, Inc. for CRA 1987 |
15 | 1 | ||
|
Status Reports on Transportation in Downtown Los Angeles by the Downtown Strategic Plan Consultant Team (Barton-Aschman, Kaku Assoc, Korve Engineering) 1990 October Scope and Contents note""prepared for LA Downtown Strategic Plan Citizens Advisory Committee""" |
15 | 2 | ||
|
Break the Evening Gridlock by the Community Redevelopment Agency 1987 April Scope and Contents note"Actions to manage traffic on downtown streets. |
15 | 3 | ||
|
Jobs, Housing and Transportation: The Great Balancing Act by California Planning Roundtable (APA) 1988 October Scope and Contents note""issues paper on California jobs/housing imbalance""" |
15 | 4 | ||
|
Strategic Actions for Improving Transportation in Downtown Los Angeles by the Community Redevelopment Agency 1987 April Scope and Contents noteDowntown employer and employee transportation survey and actions to improve the transportation system. |
15 | 5 | ||
|
Downtown Los Angeles: As We Know It and Love It by the Downtown LA Transportation Roundtable / Barton-Aschman Assoc 1989 April |
15 | 6 | ||
|
How Much Is Too Much? Parking in Downtown Los Angeles by the Community Redevelopment Agency, Barton-Aschman Assoc 1986 July Scope and Contents note""At issue is the amount of parking that developers are required to provide for new housing projects""" |
15 | 7 | ||
|
A Guide to the Restoration and Reconstruction of Angel's Flight - The Historic Inclined Railway in Downtown Los Angeles by LA Conservancy 1992 Scope and Contents note""fold-out pamphlet for wide distribution""" |
15 | 8 | ||
|
Parking in Downtown Los Angeles: Its Role in Transportation and Development Policy - White Paper by the Community Redevelopment Agency, Barton-Aschman Assoc 1985 December 7 Scope and Contents note""Arguments against the City requiring more than one parking space per 1000 square feet of commercial floor area in downtown""" |
15 | 9 | ||
|
Summary Draft Report for the Development of Milestone 6: Land Use and Development Questions and Answers by RTD Metro Rail Project 1982 September Scope and Contents noteMaster plan integration, land use impacts, and development possibilities. |
15 | 10 | ||
|
Preliminary Draft Report for the Development of Milestone 6: Land Use and Development by RTD Metro Rail Project 1982 September |
15 | 11 | ||
|
Preliminary Draft Report for the Development of Milestone 4: Station Location Alternatives by RTD Metro Rail Project 1982 June Scope and Contents noteThis 4th of 12 milestone reports addresses the location of stations along the 18-mile metro rail route, including the CDB. |
15 | 12 | ||
|
Preliminary Draft Report for Milestone 3: Route Alignment Alternatives by RTD Metro Rail Project 1982 June Scope and Contents note""This 3rd of 12 milestone reports addresses the route alignment alternatives along the 18-mile metro rail project, including the CDB" |
15 | 13 | ||
|
Upper Fifth Street traffic analysis memo by Barton-Aschman Assoc 1982 April 26 Scope and Contents noteRecommended retention of one-block street. |
15 | 14 | ||
|
Parcel A Bunker Hill traffic impact memo by Barton Aschman Assoc 1982 August 20 |
15 | 15 | ||
|
Fourth Street - Pedestrian Facilities memo by Barton-Aschman Assoc 1982 June 3 |
15 | 16 | ||
|
Seventh Street Retail Concourse Pedestrian Study by Wilber Smith and Assoc for the Community Redevelopment Agency 1982 January Scope and Contents note""Proposed connection of four retail blocks and a Downtown People Mover station by pedestrian bridges""" |
15 | 17 | ||
|
Parking and Traffic Impact Report, California Center and Bunker Hill Residential: Summary of Assumptions and Findings by Barton-Aschman Assoc- Parcel A, E-3, E-4, L, M 1981 January 20 |
15 | 18 | ||
|
Parking and Traffic Impact Report, California Center and Bunker Hill Residential by Barton-Aschman Assoc- Parcel A, E-3, E-4, L, M 1981 April Scope and Contents note""Conclusion: full on-site parking impacts on traffic flow acceptable""" |
15 | 19 | ||
|
Los Angeles Downtown People Mover: Joint Development Opportunities by the Community Redevelopment Agency 1977 December |
15 | 20 | ||
|
Walkways under Plexiglas...A Natural Extension of Man's Living Space by Rohm and Haas Co 1976 Scope and Contents notebrochure on Plexiglas pedestrian walkway installations |
15 | 21 | ||
|
CBD / Bunker Hill People Mover System by Wallen Associates 1975 February Scope and Contents noteproposed amendment to consulting contract |
15 | 22 | ||
|
Bunker Hill Pedway - Architectural Graphics Report by John Follis and Assoc 1974 July Scope and Contents noteschematic designs and preliminary graphics schedule |
15 | 23 | ||
|
Central City Elevated Pedway System: Proposed Plan and Staff Report by LA City Planning Department 1971 September |
15 | 24 | ||
|
Claim for DPM Work Third Place Tunnel by the Community Redevelopment Agency 1981 August Scope and Contents note""claim for $3.8 million to UMTA for funding to complete the construction of the remaining portions of the Bunker Hill tunnel"" - 2nd copy in carton #11" |
15 | 25-26 | ||
|
Downtown People Mover Element of the Circulation Distribution System: Executive Summary by LA City 1976 July 30 Scope and Contents noteproposal for an UMTA grant |
15 | 27 | ||
|
Downtown People Mover Element of the Circulation Distribution System (grant application) by LA City 1976 July 30 Scope and Contents noteproposal for an UMTA grant |
15 | 28 | ||
|
People Mover: West Terminal Parking Site by the Community Redevelopment Agency 1974 July Scope and Contents note""5 maps and report describing preliminary proposals""" |
15 | 29 | ||
|
Central City Elevated Pedway Proposed Plan (First Phase) by LA Dept of City Planning 1972 March 9 |
15 | 30 | ||
|
Downtown People Mover Element of the Circulation Distribution System: Application for Federal Assistance by LA City 1977 February Scope and Contents noteUMTA grant application |
15 | 31-32 | ||
|
Los Angeles Bicentennial Monument and Time Capsule at Angel's Flight by LA 2000 Committee 1981 Scope and Contents notefoldout pamphlet |
15 | 33 | ||
|
Angel's Flight and Other Funiculars by Ed Strauss 1980 Scope and Contents notearticle from Rail Classics |
15 | 34 | ||
|
Estimates of Traffic, Revenues and Expenses for the RTD, Appendix B, Final Report by Coverdale and Colpitts 1968 May |
15 | 35 | ||
|
Sources of Funds for Financing Rapid Transit (Appendix C), Examination of Alternate Modes of Rapid Transit for the LA Metro Area (Appendix D) - Final Report by Stone & Youngberg, Simpson and Curtin 1968 May |
15 | 36 | ||
|
Los Angeles People Mover - A Walk along the Route by the Community Redevelopment Agency 1977 Scope and Contents note31-page booklet for PR |
15 | 37 | ||
|
The Los Angeles Downtown People Mover by the Community Redevelopment Agency undated Scope and Contents note6-page promotional brochure |
16 | 1 | ||
|
The Downtown People Mover - Circulation Distribution System by the Community Redevelopment Agency 1976 Scope and Contents notefoldout promotional brochure |
16 | 2 | ||
|
Parking and Traffic Impact Report, California Center and Bunker Hill Residential by Barton-Aschman Assoc- Parcel A, E-3, E-4, L, M 1981 February |
16 | 3 | ||
|
Central City Pedestrian Study 1971 Scope and Contents noteinventory lists this for 1982 as ""preliminary draft study"" - same thing??" |
16 | 4 | ||
|
Carveyor System proposed for the Downtown Los Angeles Area by George Cronk and Samuel E. Lunden 1956 March 9 Scope and Contents notereprint from Southwest Builder and Contractor |
16 | 5 | ||
|
Urban Design Integration - Downtown People Mover by the Community Redevelopment Agency 1978 |
16 | 6 | ||
|
Metropolitan Structures by Metropolitan Structures commercial developers undated Scope and Contents notebrochure describing their projects |
16 | 7 | ||
|
Transportation for the 21st Century: A Plan for Los Angeles County - Staff Recommendation by LA Metropolitan Transportation Authority 1955 February 15 |
16 | 8 | ||
|
Robert E. Clark, AIA Architect by Robert E. Clark- Parcel E circa 1974 Scope and Contents noteresume and portfolio by project architect for Robert E. Alexander, architect for Bunker Hill Towers" |
16 | 9 | ||
|
Jan Peter Stern, sculptor - biography and artworks (photos) by Jan Peter Stern- Parcel D 1972 Scope and Contents notefolder |
16 | 10 | ||
|
Proposal for the Residential Towers Site Bunker Hill Urban Renewal Project by City Reconstruction Company 1965 March 1 |
16 | 11 | ||
|
Broadway Historic Theater District - walking tour by the LA Conservancy 1986 Scope and Contents notebrochure |
16 | 12 | ||
|
Central City West by Center City West Associates undated Scope and Contents noteCentral City West specific plan |
16 | 13 | ||
|
Last Remaining Seats VII by LA Conservancy circa 1984 Scope and Contents note""seventh annual series of classic films in historic theaters"" brochure" |
16 | 14 | ||
|
What Do the Roaring 20's and High-Tech 80's have in Common? undated Scope and Contents note1-pg announcement of ""Spring Renaissance"" week on Spring St, start of Spring St Renewal campaign" |
16 | 15 | ||
|
Lewitsky at Bunker Hill: A New Home for Dance (Dance Gallery) 1980 Scope and Contents notebinder w/letters of support, background, photos, economic impact" |
16 | 16 | ||
|
Office Building Inventory, Downtown Los Angeles 1990 Scope and Contents noteshows address, size, vacancy, bldg class" |
16 | 17 | ||
|
CRA State Certification (copy), and city resolution 1959 July 20 General note(legal document) |
16 | 18 | ||
|
Summary of Site Clearance and Improvement Costs for Bunker Hill Urban Renewal Project by the Community Redevelopment Agency 1958 September 2 |
16 | 19 | ||
|
Los Angeles Racquet Club brochure 1975 May Scope and Contents noteatop World Trade Center, 333 S Figueroa. Announcement of opening" |
16 | 20 | ||
|
Security Pacific Bank's New Headquarters Building 1971 April Scope and Contents notesmall brochure |
16 | 21 | ||
|
Developments 70 by the Community Redevelopment Agency 1970 October Scope and Contents notesmall brochure about projects |
16 | 22 | ||
|
Security Pacific National Bank - Quarterly Report 1971 March 31 Scope and Contents notesmall brochure includes announcement of beginning of construction |
16 | 23 | ||
|
Bunker Hill Towers sales information circa 1976 Scope and Contents notefloor plans, prices, fact sheet, news clippings, photos, ""The View from the Hill"" (3 copies) sales brochure" |
16 | 24 | ||
|
Historic Core Fact Sheet undated Scope and Contents note3 pages |
16 | 25 | ||
|
Spring Times by the Community Redevelopment Agency 1988 Spring Scope and Contents noteIssue 1, newsletter for ""Greening of Spring Street"" redevelopment" |
16 | 26 | ||
|
South Park: News of Downtown's Neighborhood by the Community Redevelopment Agency 1987 March 16 Scope and Contents noteIssue II |
16 | 27 | ||
|
South Park: News of Downtown's Neighborhood by the Community Redevelopment Agency 1988 Summer Scope and Contents noteIssue V |
16 | 28 | ||
|
Existing Land use map of South park by the Community Redevelopment Agency undated Scope and Contents notesmall map |
16 | 29 | ||
|
Bunker Hill Urban Renewal Project by the Community Redevelopment Agency- Parcel G 1968 June Scope and Contents notepacket of info, solicitation for offers, maps: vicinity, site and disposition maps" |
16 | 30 | ||
|
Architectural Record 12 1980 December Scope and Contents notefeature articles on urban centers |
16 | 31 | ||
|
Los Angeles: Host City 1984 Olympic Games map by Atlantic Richfield 1982 Scope and Contents notemap |
16 | 32 | ||
|
Downtown Los Angeles: Discover the Heart of the City of Angels by Community Redevelopment Agency and Downtown Marketing Council 1994 Scope and Contents notemap/brochure |
16 | 33 | ||
|
Angels Walk - Bunker Hill/Historic Core District by Community Redevelopment Agency, LA Dept Trans, Maguire Partners, MTA 1997 Scope and Contents note48-page brochure, ""transit and walking districts of historic LA""" |
16 | 34 | ||
|
Land Use map of downtown by Coldwell Banker 1965 February Scope and Contents noteabout 18x24 inches |
16 | 35 | ||
|
Commercial Real Estate - Downtown News Quarterly Report on Downtown LA 1993 May 10 |
16 | 36 | ||
|
Downtown Strategic Plan Study: LA City Council Districts and Rail Transit Lines (map) by the Community Redevelopment Agency 1991 October Scope and Contents notemap |
16 | 37 | ||
|
FILE: Angel's Flight by the Community Redevelopment Agency 1956-1996 Scope and Contents noteContains materials about re-opening of Angel's Flight in 1996, press releases, duplicates of some materials contained elsewhere in this collection, photocopies of photos, interview transcripts, misc. |
16 | 38-39 | ||
|
BINDER: Pre-1950's undated Scope and Contents noteBlack and white 8x10 photos (4), highway interchange model. |
16 | 40 | ||
|
BINDER: 1960's undated Scope and Contents noteBlack and white 8x10 photos (10 aerial, 3 surface parking lots, 10 models/artist's conception, 8 misc BH). |
16 | 41 | ||
|
BINDER: 1970's undated Scope and Contents note8x10 photos (some color) (7 various models, 2 mock-ups of People Mover showing City Hall and Pershing Square, 4 aerial of BH Project from different directions). |
16 | 42 | ||
|
BINDER: 1980's undated Scope and Contents notePhotos of various size (27 models and plans, 8 aerials of BH and downtown). |
16 | 43 | ||
|
BINDER: Angels Flight undated Scope and Contents noteB and white 8x10 photos (15) before dismantling. |
16 | 44 | ||
|
FILE: Tentative Disposition Plan - BH Urban Renewal Project by the Community Redevelopment Agency 1960 May 25 |
16 | 45 | ||
|
FILE: Early Project Boundary Map by the Community Redevelopment Agency 1958 May |
16 | 46 | ||
|
FILE: Early Site Plan BH Redevelopment Project undated |
16 | 47 | ||
|
FILE: Survey Plat Map BH Urban Renewal Project by the Community Redevelopment Agency 1962 March 26 Scope and Contents noteRevised 13 July 1962, for Daniel, Mann, Johnson & Mendenhall. |
16 | 48 | ||
|
FILE: Design Suggestion undated Scope and Contents noteReproducible. |
16 | 49 | ||
|
FILE: Grading and Storm Drains by Pereira & Luckman 1958 Scope and Contents noteReproducible. |
16 | 50 | ||
|
FILE: Detail of Contour Map (Fifth Street?) undated Scope and Contents noteReproducible. |
16 | 51 | ||
|
FILE: "Scheme 10" (Fourth Street grading?) by Daniel, Mann, Johnson, Mendenhall undated Scope and Contents noteReproducible. |
16 | 52 | ||
|
FILE: Existing Land Uses for BH by the Community Redevelopment Agency 1957 December Scope and Contents noteOne reproducible, one copy. |
16 | 53 | ||
|
FILE: Proposed Land Use Plan for BH - 1 of 2 by the Community Redevelopment Agency undated Scope and Contents noteOne reproducible, one copy. |
16 | 54 | ||
|
FILE: Proposed Land Use Plan for BH - 2 of 2 by the Community Redevelopment Agency undated Scope and Contents noteReproducible. |
16 | 55 | ||
|
FILE: Proposed Land Use Plan for BH - 1 of 4 by Pereira & Luckman 1958 Scope and Contents noteOne reproducible, one copy. |
16 | 56 | ||
|
FILE: Proposed Land Use Plan for BH - 2 of 4 by Pereira & Luckman 1958 Scope and Contents noteReproducible. |
16 | 57 | ||
|
FILE: Proposed Land Use Plan for BH - 3 of 4 by Pereira & Luckman 1958 Scope and Contents noteOne reproducible, 7 copies. |
16 | 58 | ||
|
FILE: Proposed Land Use Plan for BH - 4 of 4 undated Scope and Contents noteReproducible. |
16 | 59 | ||
|
FILE: Disposition Maps for BH Project by the Community Redevelopment Agency 1976 October Scope and Contents noteRevisions: Oct 76, Aug 77 (2 copies), Jan 79, Apr 81 (2), Mar 82, May 83, Oct 86. |
16 | 60 | ||
|
FILE: Illustrative Development Plans for BH Redevelopment Project by the Community Redevelopment Agency 1979 May Scope and Contents noteRevisions: May 79, Jan 81 (agency model photo), Apr 81, May 82 (4). |
16 | 61 | ||
|
FILE: Aerial Photos by the Community Redevelopment Agency 1976 November Scope and Contents noteNov 76 (2) and Apr 79 (4) |
16 | 62 | ||
|
FILE: Various maps and models undated Scope and Contents noteCity East Housing (SROs and Transitional), Seventh St Concourse (1979), aerial photos and models, LA Redevelopment Areas, Downtown Strategic Plan (1990), CBD redevelopment (1975), BH Pedestrian circulation (1976 & 1979), CDB planning areas (1991) and more. |
16 | 63 | ||
|
Yukio Kawaratani business card undated |
16 | 64 | ||
|
FILE: Ephemera undated |
16 | 65 | ||
|
A Peripheral Parking Program - Central City Los Angeles by Wilber Smith and Assoc for LA Board of parking Commissioners 1972 May Scope and Contents noteRecommended a peripheral parking plan with a people mover system. |
17 | 1 | ||
| Box | Binder | |||
|
Skidmore Owings and Merrill project portfolio by Skidmore Owings and Merrill 1979 Scope and Contents notephotographs of major projects, leather cover" |
17 | 2 | ||
| Box | Folder | |||
|
The Consultants Four Seasons Hotels portfolio submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 3. |
17 | 3 | ||
|
Los Angeles Central Library: Maguire Partners Proposal prepared by Barton Myers Associates 1981 October |
17 | 4 | ||
|
1000 Wilshire Building prepared by Langdon, Wilson, Mumper circa 1970 Scope and Contents noteproject description, plans and elevations, model photographs, master plan and phasing" |
17 | 5 | ||
|
FILE: Plans and Models undated Scope and Contents noteVarious sizes: I.M. Pei, Solomon & Cordwell, Michael Graves, Arthur Erickson, Albert C. Martin, Welton Becket Assoc, Cesar Pelli, Cabot Cabot & Forbes, South Park Assoc, Gruen, Ogren Juarez & Givas/Dworsky. |
17 | 6 | ||
|
FILE: Plans and Models (unidentified) undated |
17 | 7 | ||
|
FILE: CRA Redevelopment Project locations by the Community Redevelopment Agency undated Scope and Contents note81-84 (2), 1986 (3), nd (1) |
17 | 8 | ||
|
FILE: Property Map, Final Project Report for BH Urban Renewal Project by the Community Redevelopment Agency 1960 Scope and Contents noteRevisions through 1960, shows private/public ownership, block and parcel numbers. |
17 | 9 | ||
|
Study Model of the BH Urban Renewal Project by the Community Redevelopment Agency undated Scope and Contents note8x10 photo on cover. |
17 | 10 | ||
| Box | Binder | |||
|
Maguire Partnership project portfolio 1977 Scope and Contents notePhotographs of 3 LA office projects, leather cover. |
17 | 11 | ||
| Box | Folder | |||
|
The Sheraton Grande - Parcel C by MAT Associates/Maxwell Starkman AIA and Associates 1980 Scope and Contents notePreliminary design drawings and schematic specifications. |
18 | 1 | ||
|
Bunker Hill Los Angeles Development Information prepared by Solomon Cordwell and Associates- Parcel E 1965 Scope and Contents noteDevelopment and design proposal. |
18 | 2 | ||
|
Security Pacific Plaza, Los Angeles: A Blending of Advantages- Parcel I 1975 September Scope and Contents noteSupplement to Security Pacific News. |
18 | 3 | ||
|
California Center by BH Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteProposal / joint venture of Cadillac Fairview/CA Inc, Goldrich Kent and Assoc, Shapell Govt Hsg, 80 pp. |
18 | 4 | ||
|
BH Associates: California Center by BH Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteBoxed set 4: Proposal / joint venture of Cadillac Fairview/CA Inc, Goldrich Kent and Assoc, Shapell Govt Hsg, 80 pp (duplicates of item #116). |
18 | 5-6 | ||
|
BH Associates: California Center by BH Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteBoxed set 4: Supplemental Report to proposal. |
18 | 7 | ||
|
The Architects:The Architecture of Arthur Erickson submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 1975 Scope and Contents noteRemoved from box set 1. |
18 | 8 | ||
|
The Architects: Arthur Erickson Associates Limited catalog submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 1977 Scope and Contents noteRemoved from box set 1. |
18 | 9 | ||
|
Developers: Affirmative Action program submitted by Bunker Hill Associates- Parcel R, S, T, U, Y-1 1980 February 29 Scope and Contents noteRemoved from box set 2. |
18 | 10 | ||
|
Developers: Shapell Industries packet of brochures and reports BH Associates- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 2. |
18 | 11 | ||
|
Developers: Goldrich Kest and Associates packet of brochures and reports BH Associates: The Developers- Parcel R, S, T, U, Y-1 undated Scope and Contents noteRemoved from box set 2. |
18 | 12 | ||
| Box | ||||
|
Angel's Flight oil painting by Momo G. Shibukawa 1938 Scope and Contents noteOil on canvas, stretched, no frame, 20x24 inches. |
19 | |||
|
Angels Flight photograph undated Scope and Contents noteBlack and white, 16x20 inches, mounted on black foamcore, inventory date of 1925 is incorrect, photo also in TICOR collection, dated 1910 which is perhaps too early. |
19 | |||
|
Angeles Plaza sketch: Bunker Hill Senior Citizen Housing by Daniel L. Dworksey and Associates 1979 Scope and Contents noteInked sketch of project, 19x25 inches, mounted, no framing. |
19 | |||
|
Bunker Hill proposed Park/Museum/Angels Flight drawing 1978 Scope and Contents noteColored sketch of proposed park at top of Bunker Hill, 15x19 inches, mounted on black foamcore. |
19 | |||
|
Downtown LA, oblique aerial photograph, looking northeast at Bunker Hill and downtown 1967 Scope and Contents noteBlack and white, 16x19 inches, black foamcore mounting. |
19 | |||
|
Photo of produce market (?), downtown high-rises in background undated Scope and Contents note6x17 color panorama, mounted on board, 1990s. |
20 | |||
|
[created] Monterey Hills Redevelopment Project map by CRA of LA undated |
20 | |||
|
Bunker Hill Steps - watercolor undated Scope and Contents note12x19.5, matted. |
20 | |||
|
Plan Sections and Parking - Bunker Hill Renewal Project by Pereira & Luckman 1958 Scope and Contents note6 pages, 18x24 inches. |
20 | |||
|
Preliminary Sketch Studies - Bunker Hill Renewal Project by Pereira & Luckman 1958 Scope and Contents note20 pages, 18x24 inches. |
20 | |||
|
Trees for Bunker Hill by Eckbo, Dean, Austin & Williams 1968 Scope and Contents noteLarge portfolio of mounted photographs of recommended trees. |
21 | |||
| Box | Folder | |||
|
Moving People in Los Angeles - A Summary Report of the Los Angeles Circulation / Distribution program 1977 June Scope and Contents noteA key public oriented documentation of the Downtown People Mover Project up to and including 22 Dec 1976 Dept of Transportation selection of LA as grant recipient. |
22 | 1-2 | ||
|
Bunker Hill: Symbol of the Urban West by the Community Redevelopment Agency 1970 Scope and Contents noteBrochure, photographs by Julius Shulman. |
22 | 3 | ||
|
Central City Los Angeles 1972/1990 - Preliminary General Development Plan by the Committee for Central City Planning and Wallace, McHarg, Roberts and Todd, consultants 1972 Scope and Contents notebound copy, same as item #284?" |
22 | 4 | ||
|
[created] Metro Rail Joint Development- Central Business District by the Community Redevelopment Agency (CRA) of Los Angeles and the Southern California Rapid Transit District (SCRTD) 1984 January |
22 | 5 | ||
| Box | ||||
|
Master Plans - Los Angeles California City Planning Commission 1948 - Community Redevelopment 1948 Scope and Contents note48 pages, 18x24. |
20 | |||
| Box | Folder | |||
|
Bunker Hill Transportation Report by Daniel, Mann, Johnson & Mendenhall for Community Redevelopment Agency 1969 February 13 |
22 | 6 | ||
|
California Plaza Los Angeles, Phase 2 by Arthur Erickson Architects, WZMH Group- Parcel R, S, T, U, Y-1 1987 May 28 Scope and Contents notemaster plan provisions for events |
22 | 7 | ||
|
Technical Summary Upper Hill Development Parcel, Bunker Hill by the Community Redevelopment Agency 1971 June Scope and Contents notevarious maps and plans for site, market demand analysis" |
22 | 8 | ||
|
System Specification, Volume 2 for the Downtown People Mover by LA City 1980 April |
22 | 9 | ||
|
Status of Development Projects: Bunker Hill, Little Tokyo and CBD Redevelopment Projects by the Community Redevelopment Agency 1989 July Scope and Contents note3-pg brochure |
22 | 10 | ||
|
Downtown Access map 1987 November 23 Scope and Contents notedowntown street map, things to do, DASH shuttle route" |
22 | 11 | ||
|
Commercial Real Estate - Downtown News Spring 1997 Special Report 1997 March 24 Scope and Contents noteDowntown News section pp 11-22 |
22 | 12 | ||
|
Museum Towers- Parcel R, S, T, U, Y-1 undated Scope and Contents noteleasing brochure |
22 | 13 | ||
|
Bunker Hill Square by Connecticut General Life and Galbreath-Ruffin Corp- Parcel D 1965 Scope and Contents noteoffice leasing brochure (oversize pamphlet) |
22 | 14 | ||
|
Hill Street Metro Planning Assessment by RTD and the Community Redevelopment Agency 1992 Scope and Contents note""design and planning opportunities around Hill Street Metro Rail Stations, 15 oversize pages with color Xerox designs""" |
22 | 15 | ||
|
Bonaventure Hotel (?) cut away view undated Scope and Contents noteMounted on board 12x17. |
22 | 16 | ||
|
FILE: Grand Hope Park drawing and plan by Lawrence Halprin 1988 |
22 | 17 | ||
| Box | ||||
|
Railroad spikes undated Scope and Contents noteFrom old Angel's Flight location?? |
23 | |||
|
|
||||
Series 2: Photographs 1961-1993ArrangementOriginal order was kept in organizing this series and original folder titles and labels were used to describe the photographs. |
||||
| Box | Folder | |||
|
FILE: Downtown LA aerial photos by Western Economic Research Company 1968 Scope and Contents note11x17; 1968, 1977, 1981, 1984, 1986, 1989 (bldgs identified). |
22 | 18 | ||
| Box | ||||
|
MISC PHOTO undated Scope and Contents note5 rolls of 35 mm negatives (I.M. Pei models 3/15/63; dem 39 & 40 4/24/64; dem 41, 43, 45, 46 1/26/65; dem 49-51 7/26/65; dem 50-51 12/20/65), 6 polaroid slides (subj??), 1 5x7 negative of model, 1 5x7 and 22 4x5 negs (unidentified). |
24 | |||
| Box | Folder | |||
|
Demolition 2 1961 December 13-26 20 photos |
25 | 1 | ||
| Box | Folder | |||
|
BH 5-1 1961 December 15 4 photos |
25 | 1 | ||
|
BH 5-1 1961 December 26 1 photo |
25 | 1 | ||
|
BH 7-3, 916 W 1st 1961 December 15 1 photo |
25 | 1 | ||
|
BH 7-3 1961 December 26 1 photo |
25 | 1 | ||
|
BH 12-5, 231 S Bunker Hill Ave 1961 December 13 2 photos |
25 | 1 | ||
|
BH 12-5, 231 S Bunker Hill Ave 1961 December 26 1 photo |
25 | 1 | ||
|
BH 13-10 1961 December 13 3 photos |
25 | 1 | ||
|
BH 13-10 1961 December 26 1 photo |
25 | 1 | ||
|
BH 14-5 1961 December 13 3 photos |
25 | 1 | ||
|
BH 14-5, 212-220-222 Grand Ave 1961 December 26 3 photos |
25 | 1 | ||
|
Demolition 7 1962 May 15 1 photo |
25 | 2 | ||
| Box | Folder | |||
|
350 Clay St 1962 May 15 1 photo |
25 | 2 | ||
|
Demolition 18 1962 October 5- December 3 41 photos |
25 | 3 | ||
| Box | Folder | |||
|
BH 6-13, 113 S Flower 1962 October 5 6 photos |
25 | 3 | ||
|
BH 7-19, 117 S Flower 1962 October 5 5 photos |
25 | 3 | ||
|
BH 8-1, 916-922, 924 W 3rd 1962 November 1 8 photos |
25 | 3 | ||
|
BH 13-9, 256 S Bunker Hill Ave 1962 November 1 2 photos |
25 | 3 | ||
|
BH 13-9, 605 W 3rd 1962 November 19 3 photos |
25 | 3 | ||
|
BH 13-9, 256 S Bunker Hill Ave 1962 November 19 4 photos |
25 | 3 | ||
|
BH 15-12, 413-423 W 3rd 1962 October 5 5 photos |
25 | 3 | ||
|
BH 20-3, 311 S Grand Ave 1962 November 19 7 photos |
25 | 3 | ||
|
BH 20-3, 311 S Grand Ave 1962 December 3 1 photo |
25 | 3 | ||
|
Demolition 20 1962 December 3 - 1964 February 19 35 photos |
25 | 4 | ||
| Box | Folder | |||
|
BH 8-1, 205 S Figueroa 1962 December 3 1 photo |
25 | 4 | ||
|
BH 9-9, 254 S Figueroa 1962 December 3 6 photos |
25 | 4 | ||
|
BH 9-9, ["basement"] 1964 February 19 3 photos |
25 | 4 | ||
|
BH 9-19, 234-238 S Figueroa 1962 December 3 6 photos |
25 | 4 | ||
|
BH 9-19 1963 October 31 1 photo |
25 | 4 | ||
|
BH 10-9, 719-733 W 3rd 1962 December 3 6 photos |
25 | 4 | ||
|
BH 10-9, ["rear wing demolition"] 1963 March 1 1 photo |
25 | 4 | ||
|
BH 24-1, 904 W 3rd 1962 December 3 4 photos |
25 | 4 | ||
|
BH 24-1, ["demolition"] 1963 May 14 7 photos |
25 | 4 | ||
|
Demolition 21 1962 December 3 6 photos |
25 | 5 | ||
| Box | Folder | |||
|
BH 23-1, 800-804-808 W 3rd 1962 December 3 4 photos |
25 | 5 | ||
|
BH 23-1, 309 S Flower 1962 December 3 2 photos |
25 | 5 | ||
|
Demolition 23 1962 December 3 - 1963 December 3 19 photos |
25 | 6 | ||
| Box | Folder | |||
|
BH 17-1, 301-307 S Hill 1962 December 3 8 photos |
25 | 6 | ||
|
BH 17-1, 301-307 S Hill 1963 February 4 4 photos |
25 | 6 | ||
|
BH 17-1, 301 S Hill 1963 May 2 (?) 1 photo |
25 | 6 | ||
|
BH 17-1, [excavation below ground level] 1963 December 3 6 photos |
25 | 6 | ||
|
Demolition 24 1962 February 26 - 1963 May 14 33 photos |
25 | 7 | ||
| Box | Folder | |||
|
BH 5-19, 127 & 131 1/2 S Hope 1963 February 4 4 photos |
25 | 7 | ||
|
BH 6-9, 129 S Flower 1963 February 4 3 photos |
25 | 7 | ||
|
BH 6-9, 129 S Flower 1963 March 1 1 photo |
25 | 7 | ||
|
BH 14-7, 228 S Grand Ave 1963 February 4 3 photos |
25 | 7 | ||
|
BH 14-13, 501 W 3rd 1963 February 4 2 photos |
25 | 7 | ||
|
BH 14-13, 501 W 3rd 1963 March 1 1 photo |
25 | 7 | ||
|
BH 22-6, 724-728 W 3rd 1963 February 4 3 photos |
25 | 7 | ||
|
BH 22-6, 308 S Flower 1963 February 4 1 photo |
25 | 7 | ||
|
BH 22-6, 306-308 S Flower 1963 March 1 2 photos |
25 | 7 | ||
|
BH 22-9, 322 S Flower 1963 May 14 1 photo |
25 | 7 | ||
|
BH 22-8 & 9, [sidewalk] 1963 February 4 2 photos |
25 | 7 | ||
|
BH 22-10, 300 block of Flower 1963 February 4 1 photo |
25 | 7 | ||
|
BH 22-10, 300 block of Flower 1963 March 1 1 photo |
25 | 7 | ||
|
BH 22-11, 330 S Flower 1963 February 4 1 photo |
25 | 7 | ||
|
BH 22-11, 330 S Flower 1963 March 1 1 photo |
25 | 7 | ||
|
BH 2214 1962 February 26 1 photo |
25 | 7 | ||
|
BH 2214, 356 S Flower ["gasoline tank excavation"] 1963 May 14 1 photo 1 |
25 | 7 | ||
|
BH 23-10, 346-356 S Figueroa 1963 February 4 3 photos |
25 | 7 | ||
|
BH 23-10, 346 S Figueroa 1963 March 1 1 photo |
25 | 7 | ||
|
Demolition 25 1963 February 4 - August 5 36 photos and 2 negatives |
25 | 8 | ||
| Box | Folder | |||
|
BH 7-15, 905-911 W 2nd 1963 February 4 1 photo |
25 | 8 | ||
|
BH 7-15, 905-911 W 2nd 1963 March 1 1 photo |
25 | 8 | ||
|
BH 8-8, 211-215 1/2 S Figueroa 1963 February 4 3 photos |
25 | 8 | ||
|
BH 13-9, 255-259 S Grand Ave 1963 February 4 2 photos |
25 | 8 | ||
|
BH 13-9, 255-259 S Grand Ave 1963 March 1 1 photo |
25 | 8 | ||
|
BH 13-9, 255-259 S Grand Ave undated 5 photos |
25 | 8 | ||
|
BH 14-13, 501 W 3rd 1963 February 4 1 photo |
25 | 8 | ||
|
BH 14-13, 501 W 3rd 1963 March 1 1 photo |
25 | 8 | ||
|
BH 17-19, 353-355 S Hill 1963 February 4 4 photos |
25 | 8 | ||
|
BH 17-19, 353-355 S Hill ["dem complete"] 1963 May 14 1 photo |
25 | 8 | ||
|
BH 17-19, 353-355 S Hill 1963 August 5 2 photos |
25 | 8 | ||
|
BH 17-19, 353-355 S Hill undated 1 photo |
25 | 8 | ||
|
BH 18-5, 322-324 & 326-328 S Olive 1963 February 4 6 photos |
25 | 8 | ||
|
BH 18-6, 330-322 & 334-336 S Olive, 333 S Clay 1963 February 4 5 photos |
25 | 8 | ||
|
BH 18-6, 334-336 S Olive 1963 February 5 1 photo |
25 | 8 | ||
|
BH 18-6, 333 S Clay 1963 March 1 1 photo |
25 | 8 | ||
|
Demolition 26 1963 March 1- August 2 27 photos |
25 | 9 | ||
| Box | Folder | |||
|
BH 13-4, 218-220 S Bunker Hill Ave 1963 May 14 1 photo |
25 | 9 | ||
|
BH 13-7, 244-246 S Bunker Hill Ave 1963 May 14 5 photos |
25 | 9 | ||
|
BH 17-6, 316 S Clay [bldg condition] 1963 March 1 5 photos |
25 | 9 | ||
|
BH 17-6, 316 S Clay 1963 May 14 1 photo |
25 | 9 | ||
|
BH 17-6, Clay St 1963 August 2 1 photo |
25 | 9 | ||
|
BH 17-6 1965 March 11 4 photos |
25 | 9 | ||
|
BH 19-4, 300-304 S Grand Ave 1963 May 14 5 photos |
25 | 9 | ||
|
BH 22-19, 333 S Hope 1963 May 14 2 photos |
25 | 9 | ||
|
BH 23-3, 818-820 1/2 W 3rd 1963 May 14 3 photos |
25 | 9 | ||
|
Demolition 27 1963 March 1- 1964 March 9 19 photos |
25 | 10 | ||
| Box | Folder | |||
|
BH 7-17, 133 S Figueroa 1963 May 14 4 photos |
25 | 10 | ||
|
BH 9-18, 219 S Flower 1963 May 14 2 photos |
25 | 10 | ||
|
BH 12-1, 201-205 & 207 S Bunker Hill Ave 1963 May 14 4 photos |
25 | 10 | ||
|
BH 12-1, Hope and 2nd Sts 1963 March 1 3 photos |
25 | 10 | ||
|
BH 12-1, [Hope and 2nd Sts] 1964 March 9 1 photo |
25 | 10 | ||
|
BH 27-6, 447 S Hope 1963 May 14 3 photos |
25 | 10 | ||
|
BH 27-6, 447 S Hope 1963 July 10 1 photo |
25 | 10 | ||
|
BH 27-6, [excavation] 1963 October 31 1 photo |
25 | 10 | ||
|
Demolition 28 1963 May 14 - August 2 12 photos |
25 | 11 | ||
| Box | Folder | |||
|
BH 17-21, 339-343 S Hill 1963 May 14 5 photos |
25 | 11 | ||
|
BH 17-22, 333-337 S Hill 1963 May 14 2 photos |
25 | 11 | ||
|
BH 19-5, 300 block S Grand Ave 1963 May 14 2 photos |
25 | 11 | ||
|
BH 22-1, 702 W 3rd 1963 August 2 3 photos |
25 | 11 | ||
|
Demolition 29 1963 May 14 - July 10 44 photos |
25 | 12 | ||
| Box | Folder | |||
|
BH 7-5, 900 block W 1st ["removals only"] 1963 May 14 2 photos |
25 | 12 | ||
|
BH 7-6, 924 W 1st 1963 May 14 3 photos |
25 | 12 | ||
|
BH 7-7, 900 block W 1st 1963 May 14 2 photos |
25 | 12 | ||
|
BH 7-10, 122 S Fremont 1963 May 14 2 photos |
25 | 12 | ||
|
BH 7-11, 126 & 128 S Fremont 1963 May 14 5 photos |
25 | 12 | ||
|
BH 7-10 & 11, 124 & 128 S Fremont 1963 May 14 2 photos |
25 | 12 | ||
|
BH 12-3, 221 S Bunker Hill Ave 1963 May 14 8 photos |
25 | 12 | ||
|
BH 12-10, 200 block of Bunker Hill Ave 1963 May 14 2 photos |
25 | 12 | ||
|
BH 20-3, 310 S Bunker Hill Ave 1963 May 14 6 photos |
25 | 12 | ||
|
BH 22-18, 337-341 S Hope 1963 May 14 5 photos |
25 | 12 | ||
|
BH 22-18, ["dem. activity"] 1963 July 10 1 photo |
25 | 12 | ||
|
BH 22-22, 321-323 S Hope 1963 May 14 6 photos |
25 | 12 | ||
|
Demolition 30 1963 July 10 12 photos |
25 | 13 | ||
| Box | Folder | |||
|
BH 9-12, 805-817 W 3rd 1963 July 10 4 photos |
25 | 13 | ||
|
BH 10-8, 236 S Flower 1963 July 10 4 photos |
25 | 13 | ||
|
BH 22-13, 340-346 S Flower 1963 July 10 4 photos |
25 | 13 | ||
|
Demolition 31 1963 July 10 5 photos |
25 | 14 | ||
| Box | Folder | |||
|
BH 16-5, 231 S Hill 1963 July 10 2 photos |
25 | 14 | ||
|
BH 25-5, 427-429 S Figueroa 1963 July 10 3 photos |
25 | 14 | ||
|
Demolition 32 1963 July 10 16 photos |
25 | 15 | ||
| Box | Folder | |||
|
BH 514, 719-721 W 3rd 1963 July 10 3 photos |
25 | 15 | ||
|
BH 18-8, 344 S Olive & 345 Clay St 1963 July 10 8 photos |
25 | 15 | ||
|
BH 22-7, 312 S Flower 1963 July 10 1 photo |
25 | 15 | ||
|
BH 2414, 307-311 S Figueroa 1963 July 10 4 photos |
25 | 15 | ||
|
Demolition 33 1963 October 28 15 photos |
25 | 16 | ||
| Box | Folder | |||
|
BH 1414, 251 S Olive 1963 October 28 5 photos |
25 | 16 | ||
|
BH 22-4, 712 W 3rd 1963 October 28 3 photos |
25 | 16 | ||
|
BH 22-5, 720-722 W 3rd 1963 October 28 5 photos |
25 | 16 | ||
|
BH 22-4 & 5, Flower and 3rd Sts 1963 October 28 2 photos |
25 | 16 | ||
|
Demolition 34 1963 October 28 - 1964 March 9 12 photos |
25 | 17 | ||
| Box | Folder | |||
|
BH 25-2, 913-915 W 5th 1963 October 28 2 photos |
25 | 17 | ||
|
BH 25-2, 5th St 1963 October 31 1 photo |
25 | 17 | ||
|
BH 25-3, 905-911 W 5th 1963 October 28 2 photos |
25 | 17 | ||
|
BH 25-3, Figueroa and 5th Sts 1963 October 31 1 photo |
25 | 17 | ||
|
BH 25-3 1964 March 9 5 photos |
25 | 17 | ||
|
BH 25-2 & 3 1963 October 31 1 photo |
25 | 17 | ||
|
Demolition 35 1963 October 31 - 1964 April 32 photos |
25 | 18 | ||
| Box | Folder | |||
|
BH 9-13, 247-251 S Flower 1964 January 16 5 photos |
25 | 18 | ||
|
BH 9-13, [from a distance] 1964 April 1 photo |
25 | 18 | ||
|
BH 11-1, 708 2nd 1964 January 16 7 photos |
25 | 18 | ||
|
BH 24-11, 339-341 Figueroa 1964 January 16 2 photos |
25 | 18 | ||
|
BH 26-9 1964 February 1 photo |
25 | 18 | ||
|
BH 26-10, 458 Figueroa 1963 October 31 4 photos |
25 | 18 | ||
|
BH 26-10, [458] Figueroa 1964 February 6 photos |
25 | 18 | ||
|
BH 26-12 & 13, 433 Flower 1963 October 31 1 photo |
25 | 18 | ||
|
BH 26-12 & 13, 433-437 Flower 1964 January 16 2 photos |
25 | 18 | ||
|
BH 26-12 & 13, [433-437 Flower] 1964 February 2 photos |
25 | 18 | ||
|
BH 26-11 1964 January 16 1 photo |
25 | 18 | ||
|
Demolition 36 1963 October 31 - 1964 March 4 12 photos |
25 | 19 | ||
| Box | Folder | |||
|
BH 8-2, Vicinity of Figueroa, 2nd, Fremont and 3rd 1963 October 31 1 photo |
25 | 19 | ||
|
BH 8-2, Vicinity of Figueroa, 2nd, Fremont and 3rd 1964 March 4 11 photos |
25 | 19 | ||
|
Demolition 37 1964 March 4 11 photos |
25 | 20 | ||
| Box | Folder | |||
|
BH 15-9, Clay and Olive Sts [Blackstone Apts?] 1964 March 4 11 photos |
25 | 20 | ||
|
Demolition 38 1964 M arch 4 - April 38 photos |
25 | 21 | ||
| Box | Folder | |||
|
BH 7-4, 1st St 1964 March 4 3 photos |
25 | 21 | ||
|
BH 7-4 1964 April 2 photos |
25 | 21 | ||
|
BH 7-12, Fremont 1964 March 4 3 photos |
25 | 21 | ||
|
BH 14-1, Olive and 2nd 1964 March 4 6 photos |
25 | 21 | ||
|
BH 14-19 1964 March 4 1 photo |
25 | 21 | ||
|
BH 14-20, Olive 1964 March 4 8 photos |
25 | 21 | ||
|
BH 17-27, 328, 338, 340 Clay 1964 March 4 15 photos |
25 | 21 | ||
|
Demolition 39 1964 April 15 photos |
25 | 22 | ||
| Box | Folder | |||
|
BH 22-21 1964 April 5 photos |
25 | 22 | ||
|
BH 26-11 1964 April 3 photos |
25 | 22 | ||
|
BH 27-8 1964 April 7 photos |
25 | 22 | ||
|
Demolition 40 1964 April - August 28 29 photos |
25 | 23 | ||
| Box | Folder | |||
|
BH 20-5, [Stevens Apts] 1964 April 9 photos |
25 | 23 | ||
|
BH 21-3 1964 April 7 photos |
25 | 23 | ||
|
BH 21-3, Bunker Hill Ave 1964 April 23 1 photo |
25 | 23 | ||
|
no site number 1964 August 28 12 photos |
25 | 23 | ||
|
Demolition 41 1965 January 26 3 photos |
25 | 24 | ||
| Box | Folder | |||
|
["17-15, 20"] 1965 January 26 3 photos |
25 | 24 | ||
|
Demolition 42 1964 April 2 photos |
25 | 25 | ||
| Box | Folder | |||
|
BH 12-1 1964 April 2 photos |
25 | 25 | ||
|
Demolition 43 1965 January 26 10 photos |
25 | 26 | ||
| Box | Folder | |||
|
BH 17-6 1965 January 26 7 photos |
25 | 26 | ||
|
BH 17-23 1965 January 26 2 photos |
25 | 26 | ||
|
BH 17-24 1965 January 26 1 photo |
25 | 26 | ||
|
Demolition 45 1965 January 26 2 photos |
25 | 27 | ||
| Box | Folder | |||
|
BH 23-2 1965 January 26 2 photos |
25 | 27 | ||
|
Demolition 46 1965 January 26 19 photos |
25 | 28 | ||
| Box | Folder | |||
|
BH 5-10, [residence] 1965 January 26 1 photo |
25 | 28 | ||
|
BH 9-16, [residence] 1965 January 26 2 photos |
25 | 28 | ||
|
BH 10-2 1965 January 26 1 photo |
25 | 28 | ||
|
BH 13-6, [residence] 1965 January 26 2 photos |
25 | 28 | ||
|
BH 14-11, [residence] 1965 January 26 1 photo |
25 | 28 | ||
|
BH 15-5 1965 January 26 1 photo |
25 | 28 | ||
|
BH 19-3 1965 January 26 4 photos |
25 | 28 | ||
|
BH 21-2 1965 January 26 6 photos |
25 | 28 | ||
|
BH 21-4 1965 January 26 1 photo |
25 | 28 | ||
|
Demolition 47 1965 July 26 3 photos |
25 | 29 | ||
| Box | Folder | |||
|
BH 12-1 1965 July 26 3 photos |
25 | 29 | ||
|
Demolition 48 1965 May 6 - July 26 9 photos |
25 | 30 | ||
| Box | Folder | |||
|
BH 19-9, [Grand Ave and 3rd] 1965 May 6 2 photos |
25 | 30 | ||
|
BH 19-9 1965 July 26 1 photo |
25 | 30 | ||
|
BH 22-17 1965 May 14 2 photos |
25 | 30 | ||
|
BH 22-17 1965 July 26 4 photos |
25 | 30 | ||
|
Demoliton 49 1965 July 26 - December 20 19 photos |
25 | 31 | ||
| Box | Folder | |||
|
BH 5-13, [residence and garage] 1965 July 26 2 photos |
25 | 31 | ||
|
BH 12-7, [residence] 1965 December 20 1 photo |
25 | 31 | ||
|
BH 19-1 1965 December 20 1 photo |
25 | 31 | ||
|
BH 19-19 1965 December 20 1 photo |
25 | 31 | ||
|
BH 20-12 1965 July 26 8 photos |
25 | 31 | ||
|
BH 21-5, [residence] 1965 July 26 3 photos |
25 | 31 | ||
|
Hope St 1965 December 20 1 photo |
25 | 31 | ||
|
Cinnibar St 1965 December 20 2 photos |
25 | 31 | ||
|
Demolition 50 1965 May 14 - December 20 3 photos |
25 | 32 | ||
| Box | Folder | |||
|
BH 14-10, [Grand Ave and 2nd] 1965 May 14 2 photos |
25 | 32 | ||
|
BH 19-19 1965 December 20 1 photo |
25 | 32 | ||
|
Demolition 51 1965 December 20 2 photos |
25 | 33 | ||
| Box | Folder | |||
|
BH 12-6, [residence] 1965 December 20 1 photo |
25 | 33 | ||
|
BH 12-8, [residence] 1965 December 20 1 photo |
25 | 33 | ||
|
Demolition 52 1965 July 26 1 photo |
25 | 34 | ||
| Box | Folder | |||
|
["20, 8, 9"] [residence] 1965 July 26 1 photo |
25 | 34 | ||
|
No Demolition Numbers, Site Numbers Only #1 1962-1965 27 photos |
25 | 35 | ||
| Box | Folder | |||
|
BH 6-7, 4th St viaduct (Bunker Hill Ave) 1962 March 5 photos 5 |
25 | 35 | ||
|
BH 6-8 1965 May 14 1 photo 1 |
25 | 35 | ||
|
BH 9-10 1965 May 14 3 photos 3 |
25 | 35 | ||
|
BH 9-14 1963 May 22 3 photos 3 |
25 | 35 | ||
|
BH 12-2 1965 May 6 4 photos 4 |
25 | 35 | ||
|
BH 12-2 1965 May 14 5 photos 5 |
25 | 35 | ||
|
BH 13-5, 233 S Grand Ave 1963 May 10 1 photo 1 |
25 | 35 | ||
|
BH 13-5, 232 Bunker Hill Ave 1963 May 10 1 photo 1 |
25 | 35 | ||
|
BH 15-4 1965 May 6 2 photos 2 |
25 | 35 | ||
|
BH 15-4 1965 May 14 2 photos 2 |
25 | 35 | ||
|
No Demolition Numbers, Site Numbers Only #2 1961-1965 22 photos |
25 | 36 | ||
| Box | Folder | |||
|
BH 15-11 1961 December 1 4 photos 4 |
25 | 36 | ||
|
BH 18-1 1963 April 24 1 photo 1 |
25 | 36 | ||
|
BH 19-16, [The Ems] 1965 May 14 1 photo 2 |
25 | 36 | ||
|
BH 21-1 1965 May 11 7 photos 7 |
25 | 36 | ||
|
BH 21-8, Interiors: "Bunker Hill House 2nd floor" 1963 April 11 3 photos 3 |
25 | 36 | ||
|
BH 23-13 October 22 2 photos 6 |
25 | 36 | ||
|
BH 23-14 October 22 1 photo 1 |
25 | 36 | ||
|
BH 23-15 October 22 2 photos |
25 | 36 | ||
|
BH 23-22 October 22 1 photo |
25 | 36 | ||
|
No Demolition or Site Number #1 1962 January 14 photos |
26 | 1 | ||
| Box | Folder | |||
|
[looks like all BH area] 1962 January 14 photos 18 |
26 | 1 | ||
|
No Demolition or Site Number #2 1963 September 12 photos |
26 | 2 | ||
| Box | Folder | |||
|
"Shots of Beacon Street Area" 1963 September 12 photos 12 |
26 | 2 | ||
|
No Demolition or Site Number #3 1962 May 2-1969 December 9 46 photos |
26 | 3 | ||
| Box | Folder | |||
|
339 S Bunker Hill Ave 1962 May 2 1 photo 1 Taken from back of photoNorm, These are to make sure this building doesn't get torn down. Please keep for your files. 5/10/62 initials: DJB |
26 | 3 | ||
|
"View from County Court House, 1st and Grand" 2 photos attached for panorama scene 1962 September 13 1 photo 1 |
26 | 3 | ||
|
"View n'ly from hotel roof at 2nd and Figueroa" initials(?) 1962 September 13 1 photo 1 |
26 | 3 | ||
|
"View e'ly from Boylston s/o 2nd St" initials(?) 1962 September 13 1 photo 1 |
26 | 3 | ||
|
"Storm damage from storm of Feb 9 & 10, 1963 - photos taken by Lee Vose and Al Levy" [on Figueroa, Clay, Olive, 3rd, Bunker Hill] 1963 February 11 12 photos 12 |
26 | 3 | ||
|
3rd and Figueroa 1963 May 14 2 photos 2 |
26 | 3 | ||
|
[Untitled] 1963 October 31 9 photos 10 |
26 | 3 | ||
|
[Untitled] 1964 March 24 7 photos 7 |
26 | 3 | ||
|
Cleveland @ Union Pacific 6th & Olive 1965 January 26 2 photos 2 |
26 | 3 | ||
|
"1st day of Hauling - Tom M Hess Inc - 25 trucks, 1 Loader" 1969 March 19 2 photos 2 |
26 | 3 | ||
|
[Election campaign signs?] "Figueroa St - 4/5th on Electrolier [?]" 1969 March 28 1 photo 1 |
26 | 3 | ||
|
"Flower St - 4th/5th - New Pole (Electrolier) (Fixture not ?)" 1969 March 28 1 photo 1 |
26 | 3 | ||
|
"Figueroa St @ 4th or 5th on Bridge / Electrolier" 1969 April 1 4 photos 4 |
26 | 3 | ||
|
[Untitled] 1969 December 9 2 photos 2 |
26 | 3 | ||
|
No Demolition or Site Number #4 1973-1981 36 photos |
26 | 4 | ||
| Box | Folder | |||
|
"Tree wells being installed Grand Ave and 1st St" ["GN to Pier 1"] 1973 August 27 7 photos 7 |
26 | 4 | ||
|
"T1-BH-DEM-1 Ret. Wall to Remain" 1981 February 26 2 photos 2 |
26 | 4 | ||
|
"T1-BH-DEM-1 Hill St Sidewalk Area" 1981 February 26 1 photo 1 |
26 | 4 | ||
|
"T1-BH-DEM-1 Fill Site for Phase II, SCH." 1981 February 26 1 photo 1 |
26 | 4 | ||
|
"T1-BH-DEM-1 Site of Proposed Multi-Story Garage Structure, Hill s/o 2nd St" 1981 February 26 2 photos 2 |
26 | 4 | ||
|
"T1-BH-DEM-1" 1981 February 26 1 photo 1 |
26 | 4 | ||
|
Photos of the last riders [Angels Flight] undated 21 photos 21 |
26 | 4 | ||
|
"Southwest corner of Hill and 2nd St view west" - 4 x 5 photo undated 1 photo 1 |
26 | 4 | ||
|
Unidentified Photos #1 undated 46 photos |
26 | 5 | ||
| Box | Folder | |||
|
Various demolition scenes, wrecking ball, overturned tractor undated 25 photos 25 |
26 | 5 | ||
|
Preserving / Moving houses undated 12 photos 12 |
26 | 5 | ||
|
Alternative models for Hope / Flower and 4th St. interchange undated 9 photos 9 |
26 | 5 | ||
|
Unidentified Photos #2 Undated 21 photos |
26 | 6 | ||
| Box | Folder | |||
|
[Various] undated 18 photos 23 |
26 | 6 | ||
|
Angels Flight undated 1 photo 1 |
26 | 6 | ||
|
Old Houses undated 2 photos 2 |
26 | 6 | ||
|
Unidentified Photos #3 Undated 30 photos |
26 | 7 | ||
| Box | Folder | |||
|
Aerial b/w photos undated 30 photos 30 |
26 | 7 | ||
|
Unidentified Photos #4 Undated 15 photos |
26 | 8 | ||
| Box | Folder | |||
|
Color (DWP building in several scenes) - [negatives included] undated 15 photos 15 |
26 | 8 | ||
|
Slides #1 Undated 74 slides |
26 | 9 | ||
| Box | Folder | |||
|
"BH MISC" Box 1 / #1 of 2 undated 20 slides 20 |
26 | 9 | ||
|
"BH MISC" Box 1 / #2 of 2 undated 9 slides 9 |
26 | 9 | ||
|
"BH MISC" Box 2 / WBE ANGELS FLIGHT undated 18 slides 18 |
26 | 9 | ||
|
"MISC Bunker Hill Box 3 / #1 of 2 undated 20 slides 20 |
26 | 9 | ||
|
"MISC Bunker Hill Box 3 / #2 of 2 undated 7 slides 7 |
26 | 9 | ||
|
Slides #2 1961-1963 70 slides |
26 | 10 | ||
| Box | Folder | |||
|
"I. M. Pei Chart and Models of 5/29/63", "May 27th Pei Charts and Models" 1963 June 3 20 slides 20 |
26 | 10 | ||
|
"I. M. Pei" / #1 of 2 1963 January 19 slides 19 |
26 | 10 | ||
|
"I. M. Pei" / #2 of 2 1963 January 4 slides 4 |
26 | 10 | ||
|
Bunker Hill Model Circa 1961 12 slides 12 |
26 | 10 | ||
|
Temple Project 1962 15 slides 15 |
26 | 10 | ||
| Oversize | ||||
|
Downtown LA, aerial photograph, looking south, over Bunker Hill, freeway interchanges 1965 Scope and Contents noteBlack and white photograph, 32x40 inches, in small black frame, damaged and repaired with tape. |
1 | |||
|
Downtown LA, aerial photograph by Lloyd De Mers Air Views 1982 January 20 Scope and Contents noteColor photo, 30x39 inche4s, mounted on masonite, shows Bunker Hill high rise construction. |
2 | |||
|
Downtown LA, aerial photograph - Major Buildings Construction Period by Western Economic Research Company 1987 Scope and Contents noteBlack and white, 32x46 inches, mounted on white board, photo by Brewster Pacific Corp taken 22 Aug 1986. Image shows proposed and under construction, and dates of previous construction. |
3 | |||
|
Downtown LA, aerial photograph - Unused Development Rights Western Economic Research Company 1987 Scope and Contents noteBlack and white, 32x46 inches, mounted on white board, photo by Brewster Pacific Corp, taken 22 Aug 1986, shows parking lots and structures, TDRs available. |
4 | |||
|
Downtown LA, aerial photograph by Western Economic Research Company 1990 Scope and Contents noteBlack and white, 32x46 inches, mounted on white board, photo by Brewster Pacific Corp, taken 22 Sept 1989, shows redevelopment boundaries and constructed and planned bldgs, current to Apr 1990, Metro Blue and Red Line construction. |
5 | |||
|
Downtown LA, aerial photograph by Western Economic Research Company 1990 Scope and Contents noteBlack and white, 32x46 inches, mounted on white board, photo by Brewster Pacific Corp, taken 22 Sept 1989, shows redevelopment boundaries and constructed and planned bldgs, current to Apr 1990, Metro Blue and Red Line construction, several sites pinpointed. |
6 | |||
|
Grand Hope Park posterboard 1993 March 25 |
7 | |||
|
|
||||