Finding Aid of the B.L. Engineering, Inc. Archive
Table of Contents
Finding aid prepared by Rebecca Hirsch, Barbara Robinson and Vivian Yan, 2011 September
The processing of this collection and the creation of this finding aid was funded by the generous support of the National Historic Publications and Records Commission.
Summary Information
- Repository
- USC Libraries Special Collections
- Creator
- B.L. Engineering, Inc.
- Title
- B.L. Engineering, Inc. Archive
- Collection no.
- 0504
- Date [inclusive]
- 1969-1998
- Extent
- 42.0 Linear feet, 42 boxes
- Language
- English
- Abstract
- The B.L. Engineering Inc. archive contains the papers of the civil engineering firm B.L. Engineering, Inc., including contracts, project files, financial records, plans and drawings. The firm, founded in 1969 and owned by the Cuban American Carlos Sebastian Lorente, worked on projects throughout Los Angeles and the region.
Preferred Citation
[Box/folder# or item name], B.L. Engineering Archive (Carlos Sebastian Lorente), Collection no. 0504, Boeckmann Center for Iberian and Latin American Studies, Special Collections, USC Libraries, University of Southern California
Historical Note
B.L. Engineering, Inc., was founded in 1969 by Carlos Sebastian Lorente (owner), and partners Thomas Buenafe and Walter Gregory. The firm was a civil engineering consulting firm that did work for a number of architectural firms, engineers and goverment agencies. In the 1970s, the firm did a significant amount of work for the Community Redevelopment Agency (CRA) of the City of Los Angeles. Many of their projects were for educational institutions, but they also consulted on the construction of churches, bus maintenance facilities, and civic centers. The firm was disolved after the death of Lorente in 1993.
Scope and Content
Collection contains the archives of the civil engineering firm B.L. Engineering, Inc. These files include project files, project specifications and standards, financial records, correspondence, bills and contracts. Also included in this collection are 32 boxes with oversized technical drawings and plans of many of the firm's projects.
Administrative Information
Publication Information
USC Libraries Special Collections
2011 September
Doheny Memorial Library 206
3550 Trousdale Parkway
Los Angeles, California, 90089-0189
213-740-5900
specol@usc.edu
Revision Description
Finding aid updated and inventory of boxes 11-42 with the rolled drawings and plans completed by Barbara Robinson, 2012 October
Conditions Governing Access
COLLECTION STORED OFF-SITE. Advance notice required for access.
Conditions Governing Use
All requests for permission to publish or quote from manuscripts must be submitted in writing to the Boeckmann Center Librarian. Permission for publication is given on behalf of Special Collections as the owner of the physical items and is not intended to include or imply permission of the copyright holder, which must also be obtained.
Acquisition
Donated to the Boeckmann Center by USC alumna Yolanda Lorente between 1995 and 2011.
Processing Information
The files in this collection retain their original titles but have been rehoused and rearranged.
Controlled Access Headings
Corporate Name(s)
- B.L. Engineering, Inc. -- Archives
- Community Redevelopment Agency of the City of Los Angeles. -- Archives
Genre(s)
- Architectural drawings (visual works)
Geographic Name(s)
- Los Angeles--History--Archival resources
Personal Name(s)
- Lorente, Carlos S., (Carlos Sebastian), 1928-1993 -- Archives
Subject(s)
- Civil engineering--California--Archival resources
- Cuban American business enterprises--California--Los Angeles--Archival resources
- Industrial management--Archival resources
- Minority-owned engineering firms--California--Los Angeles--Archival resources
- Regional planning--California, Southern--Archival resources
Collection Inventory
Series 1: Project FilesScope and ContentSeries contains B.L. Engineering, Inc.'s project files. The files' original names were retained and filed in alphabetical order. Many of the file titles contain the name of the job and the firm's job number for that specific job, but some contain only the commissioning firm's name, the job number or the job name. Project files include plans, billing information, correspondence, requests for proposals and project specifications for a specific project. |
||||
| Box | Folder | |||
|
20th Street School |
1 | 1 | ||
|
20th Street School Specifications 1990 |
1 | 2 | ||
|
#285 |
1 | 3 | ||
|
1987 Agricultural Fairgrounds Facilities BIO |
1 | 4 | ||
|
A.B. Miller High School |
1 | 5-6 | ||
|
A.B. Miller High School Job #88-07 |
1 | 7 | ||
|
A.B. Miller High School - Hydrology Study Job #89-11 |
1 | 8 | ||
|
A.B. Miller Senior High School - Project Manual 1988 December |
1 | 9-13 | ||
|
A.B. Miller Senior High School - Project Manual Vol. 1 |
1 | 14-15 | ||
|
A.B. Miller Senior High School - Project Manual Vol. 2 |
1 | 16-17 | ||
|
A.B. Miller Senior High School - Sanitary Sewer Job #89-02 & 89-16 - Phase III |
1 | 18 | ||
|
A.B. Miller Senior High School - Site Work - Project Manual |
1 | 19 | ||
|
A.B. Miller Senior High School - Specifications |
1 | 20 | ||
|
Bear Gulch Elementary School Phase II, Wolff/Lang/Christopher - Job #84-20 |
1 | 21 | ||
|
Bear Gulch Elementary School Phase III |
1 | 22 | ||
|
Bell Area New School No. 1, Lane Architectural Group - Job #84-23 |
1 | 23-25 | ||
|
Belleville Ave. Kindergarten Center |
2 | 1 | ||
|
Belmont Junior High School - Job #91-12 |
2 | 2 | ||
|
Blanco Eddy |
2 | 3 | ||
|
Brown and Avila - St. Joseph Paris - Los Angeles St. & 12th St. Street Plans - Job #92-04 |
2 | 4 | ||
|
Burbank High School - Burbank Unified School District |
2 | 5 | ||
|
Burbank High School P.M. R&C |
2 | 6 | ||
|
Butterfield Ranch Elementary School |
2 | 7 | ||
|
Butterfield Ranch Elementary Chino USD W/L/C Job #86-20 |
2 | 8 | ||
|
Carlmark Residence |
2 | 9 | ||
|
Cashion Horie Cocke Gonzalez (CHCG) Job #85-18 |
2 | 10 | ||
|
Chadwick School - Science Building Howard H. Morgridge FAIA & Assoc. BL Job #79-8 |
2 | 11 | ||
|
Children's Center Group 926, Compton Ave. & Wilshire Crest, Brown & Avila - Job #77-1 |
2 | 12 | ||
|
Chino High School Job #85-06/07 |
2 | 13 | ||
|
Chino High Schools |
2 | 14 | ||
|
City of Los Angeles - Minority Business Enterprise (MBE) |
2 | 15 | ||
|
Clara St. Kindergarten Center |
2 | 16 | ||
|
Compton City Hall, Kinsey, Meeds and Williams |
2 | 17 | ||
|
Compton Civic Center Kinsey, Meeds and Williams |
2 | 18 | ||
|
Compton Fire Station Job #84-29 |
2 | 19-20 | ||
|
Condominium for U.S. Life Development Corp. of California |
2 | 21 | ||
|
Corona Avenue School William H. Howell AIA & Assoc. Job #79-23 |
2 | 22 | ||
|
CRA Bausch and Lomb, Job #80-12 |
2 | 23 | ||
|
CRA Bernal Ave. between 77th St. & Siskiyou Job #84-15 |
2 | 24 | ||
|
CRA Block 35 |
2 | 25 | ||
|
CRA Block between 11th St.-Albany-12th St. & Valencia (Coop Town Homes) - Job #79-27 |
2 | 26 | ||
|
CRA Block between Olympic Blvd, 11th A., Valencia St. & Albany St. |
2 | 27 | ||
|
CRA Casa Pico I & II (A & B) Job # 79-6 |
2 | 28 | ||
|
CRA Casa Pico Union I & II - Job #79-6 (A) & (B) |
2 | 29 | ||
|
CRA Contract, Washington Blvd. & Hoover St. - Job #78-31 |
2 | 30-31 | ||
|
CRA Contracts 1976-1991 |
2 | 32 | ||
|
CRA Contracts 1978-1985 |
2 | 33 | ||
|
CRA Correspondence 1977-1984 |
3 | 1 | ||
|
CRA Contracts Correspondence Norman A. Howard |
3 | 2 | ||
|
CRA Dedication to Albany St. Pico-Union (between Olympic & 11th St.) Realignment of Job #78-21 |
3 | 3 | ||
|
CRA Demolition 11th Pl./Valencia St. & Albany St. (Vacation), Job #78-17 |
3 | 4 | ||
|
CRA Highland Park Project, Job #77-6 |
3 | 5 | ||
|
CRA Hope St. Job #82-32 |
3 | 6 | ||
|
CRA Intersection Union Ave. & Venice Blvd. Job #80-06 |
3 | 7 | ||
|
CRA Lucy's Parking Lot |
3 | 8 | ||
|
CRA North Atwater Project, Job #77-21 |
3 | 9 | ||
|
CRA Painting, Job #79-7 |
3 | 10 | ||
|
CRA Painting, Job #79-13 |
3 | 11 | ||
|
CRA Parking Lot on 11th St. between Valencia & Albany St.'s |
3 | 12 | ||
|
CRA Pico Blvd. & Toberman St. - Job #86-09 |
3 | 13 | ||
|
CRA Pico Blvd. from Union Ave. to Fwy - Job #83-12 |
3 | 14 | ||
|
CRA Pico Union/1 (Red Shielf) Job #76-37 |
3 | 15 | ||
|
CRA Pico Union/1 (Survey) Job #77-7 |
3 | 16 | ||
|
CRA Pico Union/1 (Grading Plan) Job #77-8 |
3 | 17 | ||
|
CRA Pico Union/1 Project - Job #77-9 |
3 | 18 | ||
|
CRA Pico Union/2 Project - Job #77-13 |
3 | 19 | ||
|
CRA Pico Union/1 (Union Ave., 12th St., Valencia St., 12th Place) Job #78-1 |
3 | 20 | ||
|
CRA Pico Union (Street Plan) Job #78-6 |
3 | 21 | ||
|
CRA Union/2 (Area 2-I) Job #78-7 |
3 | 22 | ||
|
CRA Pico Union/2 (Area 1) Phase II Job #78-10 |
3 | 23 | ||
|
CRA Pico Union/2 (Area 1) Phase II Job #78-14 |
3 | 24 | ||
|
CRA Relocating Sewer 11th Pl., Job #78-18 |
3 | 25 | ||
|
CRA Pico Union/2 (Areas 3 & 4) Job #78-24 |
3 | 26 | ||
|
CRA Pico Union Co-Op Town Homes, Job #79-27 |
3 | 27 | ||
|
CRA Relocate Sanitary Sewer to Albany & 11th, Job #79-30 |
3 | 28 | ||
|
CRA Rerouting Sewer on Albany St. between Connecticut & 11th St. - Job #79-30 |
3 | 29 | ||
|
CRA Relocation of Building on Cake St. between 11th and 12th St. |
3 | 30 | ||
|
CRA Rerouting Sewer on Albany St. from 11th Place to 12th St. |
3 | 31 | ||
|
CRA Rerouting Storm Drain on Albany & 11th St. |
3 | 32 | ||
|
CRA Residence for Mr. and Mrs. Villagran |
3 | 33 | ||
|
CRA Residence for Mr. and Mrs. Villagran, Job #80-02 |
3 | 34 | ||
|
CRA Street Plan, Intersection Pico Blvd. and Union Ave. (South East Corner) Job #79-1 |
3 | 35 | ||
|
CRA Street Plan, Intersection Pico Blvd. and Union Ave. (North East Corner) Job #80-04 |
3 | 36 | ||
|
CRA Street Plan, Intersection Pico Blvd. and Union Ave. (North East Corner) Job #80-04 |
3 | 37 | ||
|
CRA Street Plan, Union Ave., 11th Pl. and 12th St. |
3 | 38 | ||
|
CRA Street Plan, Union Ave., 11th Pl., and 12th St. - Job #78-6 |
3 | 39 | ||
|
CRA Street Plan, Union Ave., 12th St., Valencia St., and 12th St. - Job #78-1 |
3 | 40 | ||
|
CRA Street Plan, Valencia St., 11th St., Albany St. and 12th St. |
3 | 41 | ||
|
CRA Topographic Survey (Rattray) Job #78-32 |
3 | 42 | ||
|
CRA Vacation Burlington Ave. between Washington Blvd. and 20th St. |
3 | 43 | ||
|
CRA Vacation Plan for 11th Pl. between Albany St. and Valencia St. - Job #78-17 |
3 | 44 | ||
|
CRA Vermont Ave. from Santa Monica Freeway to Adams |
3 | 45 | ||
|
CRA Washington Blvd. and Hoover (Street Plan) Job #78-31 |
3 | 46 | ||
|
CRA West Adams Project, Job #77-4 |
3 | 47 | ||
|
Culver/Slauson Park, Bridgers Troller Ass. - Job #77-23 |
3 | 48 | ||
|
Davidson Masakowski Association |
3 | 49 | ||
|
Dorsey High School - Group #1404 (Lunch Shelter) Robert F. Weit - Job #77-26 |
3 | 50 | ||
|
Fastrack Elementary School W/L/C Job #86-32 |
3 | 51 | ||
|
Fontana High School A.B. Miller Job #88-07, 88-11 |
3 | 52 | ||
|
Garden Gate High School, Wehmuller and Stephens, Architects - Job #77-2 |
4 | 1 | ||
|
George Air Force Base Stanton, Stockwell/Henningson Durham and Richardson |
4 | 2 | ||
|
Group #1402 - Food Service Facilities, Carver J.H.S. and Manchester Ave., Frank Thomentz, Arch. Job #78-2 |
4 | 3 | ||
|
Group #1405 Food Service Facilities, Belmont H.S., Magnolia Ave., 97th St. & Ann St. Schools Villanueva & Tate - Job #77-27 |
4 | 4 | ||
|
Group #1410 - Various (Lunch Shelter), George Schreiber - Job #77-24 |
4 | 5 | ||
|
Hemlock |
4 | 6 | ||
|
Hemlock - Job #91-28 |
4 | 7 | ||
|
Hemlock Ave. School Extra Services - Switch Drop-off Job #92-18 |
4 | 8 | ||
|
House of Marketing |
4 | 9 | ||
|
Howard Cattle Elementary "As Built" 1991-1992 |
4 | 10 | ||
|
Howard Cattle Elementary School - Project Manual 1989 March |
4 | 11-13 | ||
|
Howard Cattle Modular School |
4 | 14 | ||
|
Howard Cattle Modular School - Specifications 1988 March |
4 | 15-16 | ||
|
Howard Cattle Temp School |
4 | 17 | ||
|
Howard H. Morgridge FAIA |
4 | 18 | ||
|
Jensen Professional Building Paul K. Jensen & Assoc. |
4 | 19 | ||
|
Jobs #82-02 & 86-03 |
4 | 20 | ||
|
John Burroughs High School Playfield Development, Burbank Unified School District |
4 | 21 | ||
|
John Muir High School, Burbank Unified School District |
4 | 22 | ||
|
Jose Jimenez - Poverello Pre-School |
4 | 23 | ||
|
Jose Marti Monument |
4 | 24 | ||
|
KDG - Henderson Pasadena Dev. Job #82-36 |
4 | 25 | ||
|
KDG - Rapid Transit District Job #83-14 |
4 | 26 | ||
|
Kite & Associates San Pedro St. School Offsite - Job #90-16 & 90-17 |
4 | 27-28 | ||
|
Las Virgenes - A.E. Wright Middle School Addition #88-10 |
5 | 1 | ||
|
Las Virgenes - Indian Hill #88-06 |
5 | 2 | ||
|
LA City School District |
5 | 3-6 | ||
|
LA International Airport (Lyon & Assoc. Arch) Job #82-28 |
5 | 7 | ||
|
Lynwood High School Reconstruction of Adm. Building |
5 | 8 | ||
|
Misc School Construction |
5 | 9 | ||
|
Mohle, Grover and Associates |
5 | 10 | ||
|
Monte Vista Elementary School |
5 | 11 | ||
|
Monte Vista Elementary School Job #88-21 |
5 | 12 | ||
|
Northkirk Presbyterian Church Rancho Cucamonga, California |
5 | 13 | ||
|
Ontario Elementary School WLC #88-17 |
5 | 14 | ||
|
Parish Center Building, St. Martin of Tours Parish |
5 | 15 | ||
|
Pierce College Parking Lot |
5 | 16 | ||
|
Pioneer Natural Resources Exploration Co., Inc. - Annual Report 1977 |
5 | 17 | ||
|
Point Fermin Barelli Job #85-27 |
5 | 18 | ||
|
Point Fermin Park Refurbish |
5 | 19-20 | ||
|
Point Fermin Park, S.D. at Cabrillo Ave. |
5 | 21-22 | ||
|
Pomona Vocational Skills Development Center Arch. Barmakian, Wolff, Lang, Christopher |
5 | 23 | ||
|
Relocation of Building on the Corner of Albany St. and 11th St. |
5 | 24 | ||
|
Robert G. Bundy, Jr. 71A #88-01 |
5 | 25 | ||
|
Roy A. Sealey, Architect, Inc. Accounting Client - BL Engineering, Inc. |
5 | 26 | ||
|
San Diego Naval Base |
5 | 27 | ||
|
San Pedro Elementary School - Kite and Assoc. |
5 | 28 | ||
|
San Pedro Street School |
5 | 29-31 | ||
|
SCRTD Dist. 5 - Basic Specs |
6 | 1 | ||
|
SCRTD Division 5 - Specifications |
6 | 2-3 | ||
|
SCRTD - Division 18 |
6 | 4 | ||
|
SCRTD - Documents and Specifications for Demolition of Maintenance Building at Division 5 |
6 | 5 | ||
|
SCRTD - Documents and Specifications for New Bus Maintenance Building at Division 5 |
6 | 6 | ||
|
SCRTD - Loops |
6 | 7 | ||
|
SCRTD - Pre-proposal Conference |
6 | 8 | ||
|
SCRTD - Request for Letters of Interest and Statements of Qualifications |
6 | 9 | ||
|
SCRTD - Requests for Proposals |
6 | 10 | ||
|
Son and Francis, Architects |
6 | 11 | ||
|
Son and Francis, Archs. Wilton Pl. Elementary Phase I Job #89-03 |
6 | 12 | ||
|
Son and Francis, Archs. Wilton Pl. Elementary Phase II Job #88-28 |
6 | 13 | ||
|
Son and Francis, Archs. Wilton Pl. Elementary Phase III Job #89-18 |
6 | 14 | ||
|
Son and Francis, Archs. Wilton Pl. Elementary Street Plan Job #90-11 |
6 | 15 | ||
|
Southridge Village High School Job #84-18 |
6 | 16 | ||
|
Sulphor Spring Maintenance Warehouse W/L/C #87-06 |
6 | 17 | ||
|
Three Fontana School District Prototype Elementary Schools |
6 | 18 | ||
|
To File |
6 | 19 | ||
|
Twenty Nine Palms - Specifications Al Whittle & Associates |
6 | 20-21 | ||
|
Twenty Nine Palms - 29 Palms Al Whittle & Assoc. |
6 | 22-23 | ||
|
UCLA - Baseball C.B.T.&H. |
6 | 24 | ||
|
Various Elementary School, 59th and 95th Street School, Group #710, Maurice Flieshman, Architect |
6 | 25 | ||
|
Various Schools Group 720, Jose M. Cedeno AIA - Job #79-22 |
7 | 1 | ||
|
Villanueva/Arnoni, Architects |
7 | 2 | ||
|
Washington Elementary School, Al Whittle Associates |
7 | 3-4 | ||
|
West Hollywood Opportunity Center Howard R. Lane |
7 | 5 | ||
|
West LA College Aerospace Complex, B.G.A.M. |
7 | 6 | ||
|
William H. Howell AIA & Assoc. Accounting - Job #79-23 |
7 | 7 | ||
|
Winnetka Avenue School John Fortune |
7 | 8 | ||
|
Winter Gardens Elementary School Al Whittle & Associates |
7 | 9 | ||
|
WLC - Canyon Crest School #88-05 |
7 | 10 | ||
|
WLC - California State University Student Union Job #88-31 |
7 | 11 | ||
|
WLC - Citrus High School #90-01 |
7 | 12 | ||
|
WLC - Chino High School #3 Theruben S. Ayala S.R.H.S. Job #86-29 |
7 | 13 | ||
|
WLC - Hemlock Ave. School #88-08 |
7 | 14 | ||
|
WLC - Howard Cattle Modular School Job #88-03 |
7 | 15 | ||
|
WLC - Howard Cattle Elementary School Job #88-04 |
7 | 16 | ||
|
W/L/C - Las Virgenes Administration Building Job #88-09 |
7 | 17 | ||
|
W/L/C - Ruben S. Ayala High School Job #86-29 |
7 | 18 | ||
|
|
||||
Series 2: Specifications and StandardsScope and ContentSeries contains specifications and standards from a variety of architectural firms and government agencies used by the firm for various jobs and bids. |
||||
| Box | Folder | |||
|
California Department of Transportation Standard Plans 1975 January |
7 | 19 | ||
|
Chino Public Works Book, Specifications and Standards |
7 | 20 | ||
|
City of Los Angeles Standard Drawings 1977 July |
7 | 21-22 | ||
|
City of Los Angeles Standards |
7 | 23 | ||
|
City of Los Angeles Standards - Void |
7 | 24 | ||
|
City of Rancho Cucamonga - Standard Drawings 1981 January |
7 | 25 | ||
|
Miscellaneous |
8 | 1-3 | ||
|
Modified Specifications |
8 | 4 | ||
|
Specifications |
8 | 5 | ||
|
Specifications from Handbook |
8 | 6 | ||
|
[Unknown Specifications] |
8 | 7 | ||
|
|
||||
Series 3: Business FilesScope and ContentSeries contains the firm's financial records, including taxes, ledgers and insurance documentation, requests for proposals, job lists and contracts. |
||||
| Box | Folder | |||
|
1987 Corporate Income Tax |
8 | 8 | ||
|
Barmakin Wolff Harris Assoc. Accounting |
8 | 9-10 | ||
|
Billing Sheets |
8 | 11-12 | ||
|
Bills - American Express |
8 | 13 | ||
|
Bills - AT&T |
8 | 14 | ||
|
Bills - Commercial Graphics Corporation |
8 | 15 | ||
|
Bills - Pacific Bell |
8 | 16 | ||
|
Bills - Pacific Mutual |
8 | 17 | ||
|
Bills - Research Institute |
8 | 18 | ||
|
Binder of Board Documents |
9 | 15 | ||
|
Bridgers, Gunnarson and Assoc. |
9 | 16 | ||
|
Carmichael-Kemp Archs. |
9 | 17 | ||
|
Company History |
9 | 18 | ||
|
Contracts 1969-1991 |
9 | 19-28 | ||
|
Copies of Proposals |
10 | 1 | ||
|
D. Wehmueller/A. Stephens Architects Accounting |
8 | 19 | ||
|
Department of Benefit Payments - De 3 Quarterly Return UI & PIT |
10 | 2-3 | ||
|
Dresco Invoices |
10 | 4 | ||
|
Dun and Bradstreet Business Data |
10 | 5 | ||
|
Escudero Fribourg Assoc. Accounting Client - BL Engineering, Inc. |
10 | 6 | ||
|
Finances |
8 | 20 | ||
|
Gregory, Walter - Apodaca Case & Personal |
10 | 7 | ||
|
Incorporation Document |
10 | 8 | ||
|
Insurance |
10 | 9 | ||
|
IRS - Form 940 Employer's Annual Federal Unemployment Tax |
8 | 21 | ||
|
IRS - Form 941 Employer's Quarterly Federal Tax Return |
8 | 22 | ||
|
JAC - Year 1991 & 1992 |
8 | 23 | ||
|
JAC - Year 1993 |
8 | 24 | ||
|
Katz, Okitsu & Associates - Statement of Qualifications |
10 | 10 | ||
|
Kenneth Darling & Associates Client - BL Engineering, Inc. |
8 | 25 | ||
|
L.C. Contracts Spring 1990 |
10 | 11 | ||
|
Ledger 1969-1971 |
8 | 26 | ||
|
Ledger 1991-1994 |
8 | 27 | ||
|
Liability Insurance |
10 | 12 | ||
|
Miscellaneous |
8 | 28 | ||
|
Miscellaneous |
10 | 13-14 | ||
|
Miscellaneous Letterhead |
10 | 15 | ||
|
Office of the State Architect |
10 | 16 | ||
|
Old Time Sheets |
8 | 29 | ||
|
Oscar Leindenfrost |
10 | 17 | ||
|
Outstanding Payments 1976-1983 |
9 | 1 | ||
|
Play Sculptures |
10 | 18 | ||
|
Petty Cash Receipts 1978-1979 |
9 | 2 | ||
|
Petty Cash Receipts 1973-1979 |
9 | 3 | ||
|
Petty Cash Stubs |
9 | 4 | ||
|
Product Information |
10 | 19-20 | ||
|
Project Lists |
10 | 21 | ||
|
Postal Instant Press and Commercial Graphics Receipts |
9 | 5 | ||
|
Receipts |
9 | 6 | ||
|
Record of Payments Book - Wolff/Lang/Christopher 1987-1990 |
9 | 7 | ||
|
Record of Payments Book - Wolff/Lang/Christopher 1986-1988 |
9 | 8 | ||
|
Record of Payments Book - Wolff/Lang/Christopher 1988-1990 |
9 | 9 | ||
|
Rudy Cole |
9 | 10 | ||
|
Secretary/Stenographer Notes |
10 | 22 | ||
|
State Compensation Insurance Fund Workers Compensation 523413-79 |
9 | 14 | ||
|
Statement by Domestic Stock Corporation |
10 | 23 | ||
|
Stock Book |
9 | 11 | ||
|
Taxes |
9 | 12 | ||
|
Workman's Compensation Policy # WC 3457916 CNA 1977-1978 |
9 | 13 | ||
|
Y.L. - San Pedro |
10 | 24 | ||
|
Yolanda/BLC |
10 | 25 | ||
|
|
||||
Series 4: Rolled Drawings and PlansScope and ContentSeries contains the rolled civil engineering drawings and plans created and used by B.L. Engineering. |
Box 11-42 |
|||
| Box | ||||
|
6th Street and Figueroa Avenue (south east corner), Los Angeles, California 1972-1973 |
34 | |||
|
20th Street School, Los Angeles Unified School District, First Project 1987 March 5 |
15 | |||
|
20th Street School, City of Los Angeles, California 1990-1993 Scope and ContentFocus is on Walnut Street and Central Avenue. |
31 | |||
|
20th Street School, Los Angeles, California 1990-1993 |
31 | |||
|
20th Street School, Los Angeles, California, Los Angeles Unified School District 1968-1991 |
32 | |||
|
20th Street School, Los Angeles, California, Los Angeles Unified School District 1988-1990 Scope and ContentClassroom, multipurpose building, all weather, kindergarten building, etc. |
33 | |||
|
20th Street School, Los Angeles, California, Los Angeles Unified School District 1989-1991 Scope and ContentDemolition plan, paving and grading plan. |
42 | |||
| Box | Box | |||
|
A. B. Miller Senior High School, Fontana Unified School District 1989 July 17 |
13 | 11 | ||
| Box | ||||
|
A. B. Miller Senior High School, Fontana Unified School District 1988-1989 |
18 | |||
|
A. B. Miller Senior High School, Fontana Unified School District 1988-1989 |
22 | |||
|
A. B. Miller Senior High School, Fontana Unified School District. 1989 |
25 | |||
|
A. B. Miller Senior High School, Fontana Unified School District 1988-1989 |
26 | |||
|
A. B. Miller Senior High School, Fontana Unified School District 1989 |
27 | |||
|
A. B. Miller Senior High School, Fontana Unified School District 1989 |
29 | |||
|
Albany Street between Olympic Blvd. and Pico Blvd., City of Los Angeles, California 1970? Scope and ContentStorm drain plan and profiles. |
32 | |||
|
Bandini Elementary School, Los Angeles, California 1971 Scope and ContentNew classroom and administration building and site work. |
33 | |||
|
Bank of America Western and Olympic Branch, Los Angeles, California 1973 |
27 | |||
|
Bellevue Youth Service Center, Los Angeles, California 1986 Scope and ContentStreets bordering the school on the drawing--Micheltorena Street, Bellevue Avenue and Robinson Street. |
37 | |||
|
Belmont Area New Junior High School no. 1, Los Angeles, California, Los Angeles Unified School District 1991-1994 Scope and ContentTemple/Beaudry Area. |
39 | |||
|
Belmont Elementary School no. 1, Los Angeles, California 1990 Scope and ContentStreets bordering the school on the drawing--Micheltorena Street, Bellevue Avenue and Robinson Street.Streets bordering the school on the drawing--Micheltorena Street, Bellevue Avenue and Robinson Street. |
37 | |||
|
Buchanan Elementary School 1989 December 15 |
13 | |||
|
Buchanan Street School (Buchanan Elementary School), Los Angeles, California 1988-1993 Scope and ContentConstruction of five classroom building. |
28 | |||
|
Burbank High School, Running Track and Football Field, Burbank, California 1974 |
33 | |||
|
Cahuenga School, Los Angeles, California, Los Angeles Unified School District 1975 Scope and ContentReplacement of South Building. |
27 | |||
|
California State University, San Bernardino, Student Union Addition 1989-1991 |
23 | |||
|
California State University, San Bernardino, Student Union Addition 1991 |
26 | |||
|
Center Street from Station 2+90.58 to Station 3+90.00, City of West Covina, California 1972 |
33 | |||
|
Citrus High School, Fontana Unified School District 1989-1990 |
23 | |||
|
Civic Center for the City of South Pasadena, California 1983-1984 |
35 | |||
|
Compton City Hall |
18 | |||
|
Compton City Hall, Compton Civic Center, City of Compton, Compton, California 1974 |
27 | |||
|
Compton Civic Center |
12 | |||
|
Crenshaw Probation Building, Los Angeles, California 1973-1974 Scope and ContentRodeo Road and Victoria Avenue. |
34 | |||
|
Cuesta College Site, San Luis Obispo, California 1971 Scope and ContentSketch map of topographic survey, August 1971; map of proposed site, July 26, 1971; master plan, July 1, 1971. |
22 | |||
|
Downtown [Los Angeles] Redevelopment Projects 1981-1984 |
12 | |||
|
Downtown [Los Angeles] Redevelopment Projects 1983-1986 |
12 | |||
|
Existing building and new addition, Rancho Las Bolsas, Santa Ana, County of Orange 1973 Scope and ContentLocation at Harbor Blvd. |
32 | |||
|
Existing freezer storage building no. 4, existing berry processing buidling, existing poultry processing building: Demolition Plan 1972 |
32 | |||
|
Exposition Boulevard, Hoover Street and Menlo Street, Los Angeles, California 1974 |
34 | |||
|
Fenton Avenue School, Lake View Terrace, California, Los Angeles Unified School District 1991-1993 |
31 | |||
|
Fire Administration Building-City Hall Annex, East Mall Civic Center, City of Los Angeles, Board of Public Works Scope and ContentCovers area adjacent to Los Angeles City Hall from Main to Los Angeles Street between Temple Street and First Street. |
18 | |||
|
First Congregational Church of Glendale, Glendale, California 1970-1973 Scope and ContentNew church buildings and parking lots |
27 | |||
|
George Airforce Base, California, Weapons and Release Systems Shop |
27 | |||
|
Hazard Park and Recreation Center and Community Building Scope and ContentSite and grading plan. |
27 | |||
|
Hemlock Elementary School. Prototype Elementary School. Fontana Unified School District 1989-1992 Scope and ContentFor bidding purposes only, not for construction use. |
17 | |||
|
Hemlock Elementary School, Fontana Unified School District 1986-1992 Scope and ContentPrototype Elementary Schools. |
28 | |||
|
Hemlock Street Plaza, City of Fontana, California 1987-1993 Scope and ContentStreet improvement plans. Hemlock Elementary School and surrounding streets. |
14 | |||
|
Hesby Street School, Encino, California 1981-1988 |
36 | |||
|
Howard Cattle Elementary School, City of Chino 1989 March 24 Scope and ContentRack set. |
14 | |||
|
Howard Cattle Elementary School, City of Chino 1988-1989 |
20 | |||
|
Howard Cattle Elementary School, City of Chino 1988-1989 Scope and ContentOffsite preliminary on bid set. Addendum. For bidding purposes only--not for construction use. |
21 | |||
|
Howard Cattle Elementary School, Chino Unified School District, Chino, California 1988-1989 |
24 | |||
|
Howard Cattle Elementary School, Chino Unified School District, Chino, California 1988-1991 |
24 | |||
|
Howard Cattle Elementary School, City of Chino, California 1988-1989 Scope and ContentIncludes street improvement plan and sewer plan. Written on the outside of the rolled drawings--# 1 of 4. |
30 | |||
|
Howard Cattle Elementary School, Chino, California, Chino Unified School District 1988-1989 Scope and ContentProfile of west property line. |
33 | |||
|
Howard Cattle Elementary School, City of Chino, California 1990 Scope and ContentStorm drain plan and street improvement plan. |
40 | |||
|
Howard Cattle Modular Elementary School, Chino Unified School District 1988 Scope and ContentRack set. |
25 | |||
|
Howard Cattle Modular Elementary School, Chino, California 1988 May 16 Scope and ContentDrawer plans. |
21 | |||
|
Howard Cattle Modular Elementary School, Chino Unified School District, Chino, California 1987-1988 Scope and ContentDrawing include: civil, architecture, structural, mechanical/plumbing, electrical, landscape, and miscellaneous. |
34 | |||
|
Howard Cattle Temporary Elementary School (Howard Cattle Modular) 1988 |
23 | |||
|
Howard Cattle Temporary Elementary School, City of Chino, California 1989-1992 Scope and ContentWritten on outside of the rolled drawings: City plans (signed by city); off-site and on site. |
30 | |||
|
Howard Cattle Temporary Elementary School, Chino, California 1984-1990 Scope and ContentOn the outside of the roll of drawings is written H.C Modular, for Howard Cattle Modular Elementary School. Drawings on paving and grading, street improvement for Cypress Avenue from Clover Street to 660' south. Includes a drawing on Saratoga Place (1984). |
37 | |||
|
James J. McBride School, Los Angeles, California, Los Angeles Unified School District 1972-1973 Scope and ContentFor additional facilities, child development center. |
32 | |||
|
Jefferson New Elementary School no. 4, Los Angeles Unified School District 1990-1991 Scope and ContentThe school is bordered by these streets Compton Avenue, 57th Street, Fortuna and Slauson Avenue. |
16 | |||
|
John Muir Junior High School, Burbank Unified School District 1952-1968 |
20 | |||
|
Jose Marti Monument, Echo Park, Los Angeles, California 1975-1976 |
30 | |||
|
Lincoln High School, Los Angeles, California, Los Angeles Unified School District 1974-1975 Scope and ContentReplacement of ceramics, mechanical arts no.1 and no. 2 buildings. |
27 | |||
|
Logan Street School, Los Angeles, California, Los Angeles City Unified School District 1974 Scope and ContentClassroom, cafeteria, parking building. |
27 | |||
|
Los Angeles County Road Department: typical sections, bench mark, standard notes, key map 1966-1967 Scope and ContentMain street, Torrance Boulevard. |
33 | |||
|
Los Angeles Mall and Underground Parking-North, City of Los Angeles 1970 May 18 |
21 | |||
|
Los Angeles Street, 12th Street and Santee Street, Los Angeles, California 1992 Scope and ContentPlan and profile of storm drain and traffic signal system, for Los Angeles, Department of Transportation. |
37 | |||
|
Los Angeles Unified School District Map 1978-1979 |
12 | |||
|
Luther Burbank Junior High School, Los Angeles, California, Los Angeles City Unified School District 1974-1975 Scope and ContentDemolition grading plan. |
27 | |||
|
Lynwood High School, Lynwood, California, Lynwood Unified School District 1958 Scope and ContentPlot site and grading plan. |
28 | |||
|
Market Basket, Cathedral City, Riverside County, California 1971 |
33 | |||
|
Mayberry Street Elementary School Part II and Part III, Los Angeles, California, Los Angeles Unified School District 1990-1991 Scope and ContentPart II: adminstration and classroom building; Part III: parking lot and playground. |
39 | |||
|
Mission High School, San Fernando, California, Los Angeles Unified School District 1991 |
31 | |||
|
Monrovia Canyon Park, Development Phase I, Monrovia, California |
33 | |||
|
Monte Vista Elementary School, Los Angeles Unified School District 1988-1989 Scope and ContentConstruction of an eight classroom building. |
29 | |||
|
Moorpark Street and Sylmar Street, Los Angeles, California 1974 Scope and ContentTract no. 29614. |
34 | |||
|
Nederlander West Amphitheatre, Pre-rough Grading Plan 1990 |
27 | |||
|
North Hollywood Junior High School, North Hollywood, California 1957 Scope and ContentClassrooms, music, shop and agriculture buildings. |
33 | |||
|
Northwest Elementary School Site, Fontana, California 1986-1992 Scope and ContentTopographic survey. |
28 | |||
|
Odyssey High School, South Gate, California 1988-1992 Scope and ContentNew plant. |
38 | |||
|
Overland Avenue and Jefferson Boulevard, Sewers 1972 |
33 | |||
|
Pacific Boulevard School, Child Development Center, Huntington Park, California, Los Angeles Unified School District 1974-1975 |
27 | |||
|
Pico Boulevard and Alvarado Street, Los Angeles, California 1987-1988 |
29 | |||
|
Placentia Civic Center 1973 July 12 |
15 | |||
|
Plot site grading plan between Valley View Street and Cerulean Avenue, Garden Grove, Orange County, CA 1970 Scope and ContentOn site is Vons Market and shopping center |
33 | |||
|
Residence for Mr. and Mrs. Kevin Hughes, La Canada-Flintridge 1989 May 30 |
15 | |||
|
Ruben Ayala Senior High School, Chino, California |
16 | |||
|
Ruben S. Ayala Senior High School, Chino Unified School District, Chino, California 1987-1988 |
21 | |||
|
Saint Joseph Church, Los Angeles Street, Los Angeles, California 1984 Scope and ContentConsists of one sheet inside roll of drawings in this box for Los Angeles Street, 12th Street and Santee Street. |
37 | |||
|
Sales office for Hewlett-Packard, Neely Sales Region, Santa Clara, California 1972-1973 |
32 | |||
|
San Fernando High School, Los Angeles Unified School District 1987-1989 |
31 | |||
|
San Fernando High School, Los Angeles Unified School District Scope and ContentSite planning/utilities for modular relocatable classroom buildings. |
31 | |||
|
Seventh Day Adventist Church Property, City of Rolling Hills Estates, California 1971 Scope and ContentPrivate contract. |
34 | |||
|
Sculpture Garden Development for the Los Angeles County Museum of Art, Los Angeles, California 1974 Nov 13 |
22 | |||
|
Sculpture Garden Development, Los Angeles County Museum of Art, Los Angeles, California 1974 |
30 | |||
|
Street Topo: Eleventh Street-Union Avenue to 141 Feet East of Gratten Street; Union Avenue-Eleventh Street to 165 Feet South of Eleventh Place; Eleventh Place-Union Avenue to 380 Feet East Thereof. City of Los Angeles, County of Los Angeles 1977 May 19 |
17 | |||
|
Sunair Road from Melrose Drive to Palo Verde Drive, County of Riverside, California 1971 |
33 | |||
|
University Mall, Vermont Avenue and Jefferson 1971-1972 Scope and ContentHoover Redevelopment Projects |
16 | |||
|
University Mall, Vermont Avenue--Jefferson Boulevard, Hoover Redevelopment Project, City of Los Angeles, California 1971 |
34 | |||
|
Untitled drawing with outline of baseball diamond and large field |
17 | |||
|
Various Children Centers Group 911 1973-1990 Scope and ContentDrawings from demolition plans to construction for Wilton Place School, 95th Street School, Hyde Park School and Canoga Park School. |
37 | |||
|
West Los Angeles College, Los Angeles Community College District 1972 |
12 | |||
|
West Los Angeles College, Culver City, California 1965-1968 Scope and ContentPrepared for the Board of Education, Los Angeles City Junior College District. |
19 | |||
|
West Los Angeles College, Culver City, California 1966-1970 Scope and ContentPrepared for the Board of Education, Los Angeles City Junior College District. West Los Angeles College is also referred to a West Los Angeles Junior College on some of the drawings. |
24 | |||
|
West Los Angeles College, Culver City, California 1968 Scope and ContentAdminstration and Classroom buildings, food service unit and men's and women's physical education facilities. |
35 | |||
|
Will Rogers Elementary School, Lynwood Unified School District, Lynwood, California 1973 Sept 11 |
20 | |||
|
Willow Elementary School, Las Virgenes Unified School District, Agoura Hills, California 1987 |
36 | |||
|
Wilton Place Elementary School, Los Angeles, California, Los Angeles Unified School District 1990-1992 Scope and ContentMultipurpose/classroom and children's center building. |
35 | |||
|
Wilton Place Elementary School, Los Angeles, California, Los Angeles Unified School District 1990 Scope and ContentMultipurpose/classroom buildings, food service unit and men's and women's physical education facilities. |
36 | |||
|
Wilton Place Elementary School, Los Angeles, California, Los Angeles Unified School District 1991-1992 Scope and ContentMultipurpose, classroom and children's building. |
38 | |||
|
Wilton Place Elementary School, Los Angeles, California, Los Angeles Unified School District 1990 Scope and ContentMultipurpose room and childcare center. |
40 | |||
|
Wilton Place Elementary School, Los Angeles, California, Los Angeles Unified School District 1990 Scope and ContentMultipurpose/classroom and children's center building. |
41 | |||
|
|
||||